IAC logo
IAC Recommendation Types
Sponsored by:
DOE MESC
IAC logo
IAC Recommendation Types
The Assessment Recommendation Codes ARC is a system for classifying recommendations. [Manual]
Reset
TOP ARC Description Recommendations Reccs Recommended $ Savings Average Payback (yrs) Implementation Rate Imp Rate
back 2.xxxx 2.xxxx ENERGY MANAGEMENT 135,010 $1,836,042,732 1.8 50.9%
back 2.3xxx 2.3xxx Electrical Power 6,323 $307,623,317 1.6 36.0%
back 2.31xx 2.31xx DEMAND MANAGEMENT 3,044 $43,456,919 0.7 40.0%
2.319x 2.319x Miscellaneous 648 $12,010,919 1.3 35.9%
2.3191 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER 559 $6,696,396 1.2 36.8%
2.3192 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS 89 $5,314,523 1.8 30.1%