IAC logo
IAC Assessment: CO0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1986
Principal Product BOTTLED MILK
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 7,000 Thousand Gallons
Production Hrs. Annual 2,964
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,393 1,308,031 kWh $0.06
Natural Gas $53,932 12,797 MMBtu $4.21
TOTAL ENERGY COSTS $133,325
RECOMMENDED SAVINGS* $20,662 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,207
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$3,878
Cost:
$200
$3,878 63,892 - - $3,878
63,892
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$648
Cost:
$300
- - $648 154 -
-
kWh
$648
154
MMBtu
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,349
Cost:
$7,000
- - $2,349 558 -
-
kWh
$2,349
558
MMBtu
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,455
Cost:
-
$2,455 40,445 - - $2,455
40,445
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,455
Cost:
$2,400
$2,455 40,445 - - $2,455
40,445
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,393
Cost:
$950
- - $3,393 806 -
-
kWh
$3,393
806
MMBtu
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,760
Cost:
$200
- - $1,760 418 -
-
kWh
$1,760
418
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,323
Cost:
$188
$498 8,206 $825 196 $498
8,206
kWh
$825
196
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$729
Cost:
$100
$729 12,016 - - $729
12,016
kWh
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$178
Cost:
$200
$178 2,931 - - $178
2,931
kWh
-
-
MMBtu
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$480
Cost:
$744
$480 7,913 - - $480
7,913
kWh
-
-
MMBtu
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,014
Cost:
$860
$1,014 16,706 - - $1,014
16,706
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$20,662
Cost:
$13,142
$11,687 192,554 $8,975 2,132 $11,687
192,554
kWh
$8,975
2,132
MMBtu
TOTAL IMPLEMENTED Savings:
$18,207
Cost:
$13,142
$9,232 152,109 $8,975 2,132 $9,232
152,109
kWh
$8,975
2,132
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas