IAC logo
IAC Assessment: CO0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1987
Principal Product PRINTED CIRCUIT BOARDS
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $1,000,000-$5,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 527,000 Pieces
Production Hrs. Annual 4,500
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,408 898,886 kWh $0.07
Natural Gas $5,023 1,206 MMBtu $4.17
TOTAL ENERGY COSTS $64,431
RECOMMENDED SAVINGS* $15,233 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,770
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$161
Cost:
$200
$161 2,345 - - $161
2,345
kWh
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$226
Cost:
$2,000
- - $226 54 -
-
kWh
$226
54
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,136
Cost:
$700
$1,136 17,292 - - $1,136
17,292
kWh
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$8,463
Cost:
$1,200
$8,463 128,077 - - $8,463
128,077
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,111
Cost:
$1,150
- - $1,111 267 -
-
kWh
$1,111
267
MMBtu
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,215
Cost:
$250
$2,983 - $232 - $2,983
-
kWh
$232
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$921
Cost:
$318
$921 14,068 - - $921
14,068
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,233
Cost:
$5,818
$13,664 161,782 $1,569 321 $13,664
161,782
kWh
$1,569
321
MMBtu
TOTAL IMPLEMENTED Savings:
$6,770
Cost:
$4,618
$5,201 33,705 $1,569 321 $5,201
33,705
kWh
$1,569
321
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas