IAC logo
IAC Assessment: CO0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1989
Principal Product CLEANING MACHINES
NAICS n/a
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 16,000 Pieces
Production Hrs. Annual 2,860
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,344 640,973 kWh $0.05
Natural Gas $18,885 4,694 MMBtu $4.02
TOTAL ENERGY COSTS $50,229
RECOMMENDED SAVINGS* $10,446 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,446
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,830
Cost:
$1,200
- - $2,830 704 -
-
kWh
$2,830
704
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,014
Cost:
$400
$159 3,224 $855 213 $159
3,224
kWh
$855
213
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$330
Cost:
$500
- - $330 81 -
-
kWh
$330
81
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$430
Cost:
$200
- - $430 108 -
-
kWh
$430
108
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,260
Cost:
$1,000
- - $3,260 811 -
-
kWh
$3,260
811
MMBtu
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,325
Cost:
$100
$801 - $524 - $801
-
kWh
$524
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$417
Cost:
$900
$417 8,499 - - $417
8,499
kWh
-
-
MMBtu
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$840
Cost:
$300
$840 17,292 - - $840
17,292
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,446
Cost:
$4,600
$2,217 29,015 $8,229 1,917 $2,217
29,015
kWh
$8,229
1,917
MMBtu
TOTAL IMPLEMENTED Savings:
$10,446
Cost:
$4,600
$2,217 29,015 $8,229 1,917 $2,217
29,015
kWh
$8,229
1,917
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas