IAC logo
IAC Assessment: CO0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1989
Principal Product SMALL PLATED PARTS
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Pieces
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,113 655,041 kWh $0.08
Natural Gas $17,289 4,321 MMBtu $4.00
TOTAL ENERGY COSTS $67,402
RECOMMENDED SAVINGS* $6,588 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,311
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,153
Cost:
$250
$866 - $287 - $866
-
kWh
$287
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,360
Cost:
$3,500
$3,360 43,962 $(-1,000) (-250) $3,360
43,962
kWh
$(-1,000)
(-250)
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$530
Cost:
$79
$140 5,275 $390 97 $140
5,275
kWh
$390
97
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,020
Cost:
$1,000
- - $1,020 256 -
-
kWh
$1,020
256
MMBtu
05: 2.1222 INSTALL TURBULATORS Savings:
$277
Cost:
$800
- - $277 70 -
-
kWh
$277
70
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$500
Cost:
$680
$500 6,448 - - $500
6,448
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$618
Cost:
$131
$618 8,206 - - $618
8,206
kWh
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$130
Cost:
$310
- - $130 33 -
-
kWh
$130
33
MMBtu
TOTAL RECOMMENDED Savings:
$6,588
Cost:
$6,750
$5,484 63,891 $1,104 206 $5,484
63,891
kWh
$1,104
206
MMBtu
TOTAL IMPLEMENTED Savings:
$6,311
Cost:
$5,950
$5,484 63,891 $827 136 $5,484
63,891
kWh
$827
136
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas