IAC Assessment: CO0155
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0155
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1989
Principal Product METAL PLATING
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $500,000-$1,000,000
# of Employees 15
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Pieces
Production Hrs. Annual 4,342
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,078 213,951 kWh $0.09
Natural Gas $24,193 5,896 MMBtu $4.10
TOTAL ENERGY COSTS $43,271
RECOMMENDED SAVINGS* $8,461 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,789
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,800
Cost:
$3,320
- - $2,800 684 -
-
kWh
$2,800
684
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,324
Cost:
$1,000
$1,793 20,223 $(-469) (-114) $1,793
20,223
kWh
$(-469)
(-114)
MMBtu
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,160
Cost:
$250
$510 - $650 - $510
-
kWh
$650
-
MMBtu
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$990
Cost:
$500
- - $990 241 -
-
kWh
$990
241
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$259
Cost:
$83
$259 2,931 - - $259
2,931
kWh
-
-
MMBtu
06: 2.2514 COVER OPEN TANKS Savings:
$505
Cost:
$220
$133 4,982 $372 91 $133
4,982
kWh
$372
91
MMBtu
07: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$1,043
Cost:
$3,000
- - $1,043 254 -
-
kWh
$1,043
254
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$230
Cost:
$100
$230 2,638 - - $230
2,638
kWh
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$150
Cost:
$200
$150 1,758 - - $150
1,758
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,461
Cost:
$8,673
$3,075 32,532 $5,386 1,156 $3,075
32,532
kWh
$5,386
1,156
MMBtu
TOTAL IMPLEMENTED Savings:
$2,789
Cost:
$1,133
$1,149 7,327 $1,640 241 $1,149
7,327
kWh
$1,640
241
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas