IAC logo
IAC Assessment: CO0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1990
Principal Product FIRE PROOFING PRODUCTS
NAICS n/a
SIC 3297 - Nonclay Refractories
Sales $10,000,000-$50,000,000
# of Employees 13
Plant Area (Sq.Ft.) 0
Annual Production 8,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,595 2,695,487 kWh $0.04
Natural Gas $170,705 59,267 MMBtu $2.88
TOTAL ENERGY COSTS $274,300
RECOMMENDED SAVINGS* $58,518 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,998
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING Savings:
$44,728
Cost:
$40,000
$6,948 181,125 - - $37,780 - $6,948
181,125
kWh
-
-
MMBtu
$37,780
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,130
Cost:
$11,740
- - $9,130 3,171 - - -
-
kWh
$9,130
3,171
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,650
Cost:
$1,000
$1,650 43,083 - - - - $1,650
43,083
kWh
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,390
Cost:
$500
$1,390 36,049 - - - - $1,390
36,049
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,350
Cost:
$1,800
$1,350 35,170 - - - - $1,350
35,170
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$270
Cost:
$200
$270 7,034 - - - - $270
7,034
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$58,518
Cost:
$55,240
$11,608 302,461 $9,130 3,171 $37,780 - $11,608
302,461
kWh
$9,130
3,171
MMBtu
$37,780
-
$
TOTAL IMPLEMENTED Savings:
$47,998
Cost:
$43,000
$10,218 266,412 - - $37,780 - $10,218
266,412
kWh
-
-
MMBtu
$37,780
-
$
Savings
Cost
$ kWh $ MMBtu $ $