IAC logo
IAC Assessment: CO0178
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0178
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1990
Principal Product BRIDGE SUPPORT SYSTEMS
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 12,000 Tons
Production Hrs. Annual 4,640
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,942 1,546,893 kWh $0.06
Natural Gas $44,605 9,950 MMBtu $4.48
TOTAL ENERGY COSTS $138,547
RECOMMENDED SAVINGS* $16,893 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,893
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS Savings:
$5,140
Cost:
$600
$5,140 84,701 - - $5,140
84,701
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,660
Cost:
$400
$4,660 76,788 - - $4,660
76,788
kWh
-
-
MMBtu
03: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$3,650
Cost:
$1,100
- - $3,650 814 -
-
kWh
$3,650
814
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,050
Cost:
$1,500
- - $2,050 458 -
-
kWh
$2,050
458
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$390
Cost:
$1,000
- - $390 87 -
-
kWh
$390
87
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$400
Cost:
$150
- - $400 89 -
-
kWh
$400
89
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$283
Cost:
$325
$283 4,689 - - $283
4,689
kWh
-
-
MMBtu
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$320
Cost:
$300
$320 5,275 - - $320
5,275
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,893
Cost:
$5,375
$10,403 171,453 $6,490 1,448 $10,403
171,453
kWh
$6,490
1,448
MMBtu
TOTAL IMPLEMENTED Savings:
$16,893
Cost:
$5,375
$10,403 171,453 $6,490 1,448 $10,403
171,453
kWh
$6,490
1,448
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas