IAC Assessment: CO0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1990
Principal Product CIRCUIT COMPUTER CHIPS
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 70 Pieces
Production Hrs. Annual 8,736
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $638,224 16,844,080 kWh $0.04
Natural Gas $176,704 48,222 MMBtu $3.66
TOTAL ENERGY COSTS $814,928
RECOMMENDED SAVINGS* $50,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,970
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$7,600
Cost:
$500
$7,600 201,348 - - $7,600
201,348
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,500
Cost:
$4,000
- - $6,500 1,781 -
-
kWh
$6,500
1,781
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,630
Cost:
$12,700
$3,630 95,838 - - $3,630
95,838
kWh
-
-
MMBtu
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$8,590
Cost:
$1,300
$7,040 264,068 $1,550 422 $7,040
264,068
kWh
$1,550
422
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,320
Cost:
$3,670
$3,320 87,046 - - $3,320
87,046
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,280
Cost:
$2,100
$2,280 60,375 - - $2,280
60,375
kWh
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,190
Cost:
$20,700
$18,190 - - - $18,190
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$50,110
Cost:
$44,970
$42,060 708,675 $8,050 2,203 $42,060
708,675
kWh
$8,050
2,203
MMBtu
TOTAL IMPLEMENTED Savings:
$24,970
Cost:
$7,900
$16,920 525,791 $8,050 2,203 $16,920
525,791
kWh
$8,050
2,203
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas