IAC logo
IAC Assessment: CO0187
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0187
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1990
Principal Product FLUID MILK
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 0
Annual Production 18,000 Thousand Gallons
Production Hrs. Annual 4,940
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,479 2,208,968 kWh $0.06
Natural Gas $47,647 14,193 MMBtu $3.36
TOTAL ENERGY COSTS $179,126
RECOMMENDED SAVINGS* $30,821 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,886
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$11,200
Cost:
$28,000
- - $11,200 2,870 - - -
-
kWh
$11,200
2,870
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,370
Cost:
$12,000
- - $4,370 1,120 - - -
-
kWh
$4,370
1,120
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,340
Cost:
$15,000
- - $6,340 1,626 - - -
-
kWh
$6,340
1,626
MMBtu
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$5,000
Cost:
$1,200
- - $5,000 - - - -
-
kWh
$5,000
-
MMBtu
-
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$1,570
Cost:
$1,100
- - $745 190 $825 - -
-
kWh
$745
190
MMBtu
$825
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$935
Cost:
$1,700
$935 15,826 - - - - $935
15,826
kWh
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$830
Cost:
$1,000
$830 13,775 - - - - $830
13,775
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$576
Cost:
$267
$576 9,672 - - - - $576
9,672
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$30,821
Cost:
$60,267
$2,341 39,273 $27,655 5,806 $825 - $2,341
39,273
kWh
$27,655
5,806
MMBtu
$825
-
$
TOTAL IMPLEMENTED Savings:
$29,886
Cost:
$58,567
$1,406 23,447 $27,655 5,806 $825 - $1,406
23,447
kWh
$27,655
5,806
MMBtu
$825
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes