IAC logo
IAC Assessment: CO0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1991
Principal Product CERAMIC PRODUCTS
NAICS n/a
SIC 3264 - Porcelain Electrical Supplies
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 8,736
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $863,181 18,017,585 kWh $0.05
Natural Gas $935,922 274,445 MMBtu $3.41
TOTAL ENERGY COSTS $1,799,103
RECOMMENDED SAVINGS* $18,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,700
Cost:
$500
$1,700 35,463 - - $1,700
35,463
kWh
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,300
Cost:
$1,500
$3,300 145,955 - - $3,300
145,955
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,350
Cost:
$3,047
$3,350 69,754 - - $3,350
69,754
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,665
Cost:
$5,400
$4,665 97,304 - - $4,665
97,304
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,665
Cost:
$5,440
$4,665 97,304 - - $4,665
97,304
kWh
-
-
MMBtu
06: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,000
Cost:
$1,000
- - $1,000 295 -
-
kWh
$1,000
295
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$230
Cost:
$400
- - $230 67 -
-
kWh
$230
67
MMBtu
TOTAL RECOMMENDED Savings:
$18,910
Cost:
$17,287
$17,680 445,780 $1,230 362 $17,680
445,780
kWh
$1,230
362
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas