IAC logo
IAC Assessment: CO0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1991
Principal Product FABRICATED METAL
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pieces
Production Hrs. Annual 2,210
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,704 414,127 kWh $0.08
Natural Gas $23,575 5,993 MMBtu $3.93
TOTAL ENERGY COSTS $55,279
RECOMMENDED SAVINGS* $4,664 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$900
Cost:
$2,500
$900 11,723 - - $900
11,723
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$561
Cost:
$157
$561 7,327 - - $561
7,327
kWh
-
-
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$891
Cost:
$2,000
$157 2,052 $734 187 $157
2,052
kWh
$734
187
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$600
Cost:
$1,000
- - $600 154 -
-
kWh
$600
154
MMBtu
05: 2.2514 COVER OPEN TANKS Savings:
$823
Cost:
$580
- - $823 189 -
-
kWh
$823
189
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$580
Cost:
$200
$580 7,620 - - $580
7,620
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$83
Cost:
$242
$83 1,172 - - $83
1,172
kWh
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$226
Cost:
$570
- - $226 59 -
-
kWh
$226
59
MMBtu
TOTAL RECOMMENDED Savings:
$4,664
Cost:
$7,249
$2,281 29,894 $2,383 589 $2,281
29,894
kWh
$2,383
589
MMBtu
TOTAL IMPLEMENTED Savings:
-