IAC logo
IAC Assessment: CO0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1991
Principal Product INJECTION MOLDED PRODUCT
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,731 4,072,978 kWh $0.05
Natural Gas $4,978 982 MMBtu $5.07
TOTAL ENERGY COSTS $214,709
RECOMMENDED SAVINGS* $9,267 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,267
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,221
Cost:
-
$3,046 59,203 - - $(-1,825) - $3,046
59,203
kWh
-
-
MMBtu
$(-1,825)
-
$
02: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$1,750
Cost:
$1,050
$1,750 33,998 - - - - $1,750
33,998
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$390
Cost:
$200
$390 7,620 - - - - $390
7,620
kWh
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$721
Cost:
$750
$194 7,913 $527 104 - - $194
7,913
kWh
$527
104
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$400
Cost:
$450
- - $400 79 - - -
-
kWh
$400
79
MMBtu
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$800
Cost:
$1,730
$800 15,533 - - - - $800
15,533
kWh
-
-
MMBtu
-
-
$
07: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT Savings:
$1,600
Cost:
$3,200
$1,600 - - - - - $1,600
-
kWh
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,715
Cost:
$3,130
$1,715 14,947 - - - - $1,715
14,947
kWh
-
-
MMBtu
-
-
$
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$670
Cost:
$1,600
$(-90) (-1,758) $760 150 - - $(-90)
(-1,758)
kWh
$760
150
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,267
Cost:
$12,110
$9,405 137,456 $1,687 333 $(-1,825) - $9,405
137,456
kWh
$1,687
333
MMBtu
$(-1,825)
-
$
TOTAL IMPLEMENTED Savings:
$9,267
Cost:
$12,110
$9,405 137,456 $1,687 333 $(-1,825) - $9,405
137,456
kWh
$1,687
333
MMBtu
$(-1,825)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes