IAC Assessment: CO0234
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0234
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1992
Principal Product Beer
NAICS n/a
SIC 2082 - Malt Beverages
Sales $500,000-$1,000,000
# of Employees 30
Plant Area (Sq.Ft.) 14,000
Annual Production 6,000 Pieces
Production Hrs. Annual 2,288
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,363 291,911 kWh $0.07
Natural Gas $9,798 2,552 MMBtu $3.84
TOTAL ENERGY COSTS $29,161
RECOMMENDED SAVINGS* $3,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,150
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$810
Cost:
$250
$654 - $156 - $654
-
kWh
$156
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,000
Cost:
$230
$1,000 11,723 - - $1,000
11,723
kWh
-
-
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$505
Cost:
$150
$340 13,189 $165 22 $340
13,189
kWh
$165
22
MMBtu
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$85
Cost:
$10,700
$85 1,172 - - $85
1,172
kWh
-
-
MMBtu
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$390
Cost:
$1,380
$390 14,947 - - $390
14,947
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$360
Cost:
$1,480
$235 3,517 $125 33 $235
3,517
kWh
$125
33
MMBtu
TOTAL RECOMMENDED Savings:
$3,150
Cost:
$14,190
$2,704 44,548 $446 55 $2,704
44,548
kWh
$446
55
MMBtu
TOTAL IMPLEMENTED Savings:
$3,150
Cost:
$14,190
$2,704 44,548 $446 55 $2,704
44,548
kWh
$446
55
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas