IAC logo
IAC Assessment: CO0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1992
Principal Product Steel Tanks/Fabricated Steel Prod.
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 92,600
Annual Production 2,000,000 Pounds
Production Hrs. Annual 3,016
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,516 1,067,995 kWh $0.08
Natural Gas $34,988 9,281 MMBtu $3.77
TOTAL ENERGY COSTS $123,504
RECOMMENDED SAVINGS* $34,106 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,590
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Primary Raw Material Electricity Usage Natural Gas Administrative Changes Primary Raw Material
$ kWh $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,100
Cost:
$250
- - - - $1,100 - - - -
-
kWh
-
-
MMBtu
$1,100
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$820
Cost:
$5
- - $820 218 - - - - -
-
kWh
$820
218
MMBtu
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,120
Cost:
$1,300
- - $1,120 315 - - - - -
-
kWh
$1,120
315
MMBtu
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$190
Cost:
$10
- - $190 51 - - - - -
-
kWh
$190
51
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,500
Cost:
$29,730
$28,500 343,787 - - - - - - $28,500
343,787
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$190
Cost:
$10
$190 2,345 - - - - - - $190
2,345
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$360
Cost:
$310
$360 14,654 - - - - - - $360
14,654
kWh
-
-
MMBtu
-
-
$
-
-
$
08: 3.1121 USE MORE EFFICIENT ADHESIVE APPLICATORS Savings:
$1,516
Cost:
$1,700
- - - - - - $1,516 - -
-
kWh
-
-
MMBtu
-
-
$
$1,516
-
$
09: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$310
Cost:
$1,500
$310 12,016 - - - - - - $310
12,016
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$34,106
Cost:
$34,815
$29,360 372,802 $2,130 584 $1,100 - $1,516 - $29,360
372,802
kWh
$2,130
584
MMBtu
$1,100
-
$
$1,516
-
$
TOTAL IMPLEMENTED Savings:
$32,590
Cost:
$33,115
$29,360 372,802 $2,130 584 $1,100 - - - $29,360
372,802
kWh
$2,130
584
MMBtu
$1,100
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Primary Raw Material Electricity Usage Natural Gas Administrative Changes Primary Raw Material