Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1992 |
Principal Product | Steel Tanks/Fabricated Steel Prod. |
NAICS | n/a |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 92,600 |
Annual Production | 2,000,000 Pounds |
Production Hrs. Annual | 3,016 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $88,516 | 1,067,995 | kWh | $0.08 |
Natural Gas | $34,988 | 9,281 | MMBtu | $3.77 |
TOTAL ENERGY COSTS | $123,504 | |||
RECOMMENDED SAVINGS* | $34,106 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,590 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Primary Raw Material | Electricity Usage | Natural Gas | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $1,100 Cost: $250 |
- | - | - | - | $1,100 | - | - | - |
- - kWh |
- - MMBtu |
$1,100 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $820 Cost: $5 |
- | - | $820 | 218 | - | - | - | - |
- - kWh |
$820 218 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,120 Cost: $1,300 |
- | - | $1,120 | 315 | - | - | - | - |
- - kWh |
$1,120 315 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $190 Cost: $10 |
- | - | $190 | 51 | - | - | - | - |
- - kWh |
$190 51 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $28,500 Cost: $29,730 |
$28,500 | 343,787 | - | - | - | - | - | - |
$28,500 343,787 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $190 Cost: $10 |
$190 | 2,345 | - | - | - | - | - | - |
$190 2,345 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $360 Cost: $310 |
$360 | 14,654 | - | - | - | - | - | - |
$360 14,654 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1121 USE MORE EFFICIENT ADHESIVE APPLICATORS |
Savings: $1,516 Cost: $1,700 |
- | - | - | - | - | - | $1,516 | - |
- - kWh |
- - MMBtu |
- - $ |
$1,516 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM |
Savings: $310 Cost: $1,500 |
$310 | 12,016 | - | - | - | - | - | - |
$310 12,016 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,106 Cost: $34,815 |
$29,360 | 372,802 | $2,130 | 584 | $1,100 | - | $1,516 | - | $29,360 372,802 kWh |
$2,130 584 MMBtu |
$1,100 - $ |
$1,516 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,590 Cost: $33,115 |
$29,360 | 372,802 | $2,130 | 584 | $1,100 | - | - | - | $29,360 372,802 kWh |
$2,130 584 MMBtu |
$1,100 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Primary Raw Material | Electricity Usage | Natural Gas | Administrative Changes | Primary Raw Material |