IAC Assessment: CO0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1993
Principal Product Electronics
NAICS n/a
SIC 3629 - Electrical Industrial Apparatus, Nec
Sales $5,000,000-$10,000,000
# of Employees 105
Plant Area (Sq.Ft.) 43,000
Annual Production 4,500 Pieces
Production Hrs. Annual 3,250
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,073 847,304 kWh $0.07
Natural Gas $8,433 2,310 MMBtu $3.65
TOTAL ENERGY COSTS $64,506
RECOMMENDED SAVINGS* $8,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,970
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,900
Cost:
$250
$1,900 28,722 - - $1,900
28,722
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,980
Cost:
$1,730
$2,980 44,842 - - $2,980
44,842
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,630
Cost:
$600
$1,630 24,619 - - $1,630
24,619
kWh
-
-
MMBtu
04: 2.7314 REDUCE VENTILATION AIR Savings:
$1,070
Cost:
$1,760
$170 2,638 $900 248 $170
2,638
kWh
$900
248
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$700
Cost:
$1,050
$130 4,982 $570 157 $130
4,982
kWh
$570
157
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$450
Cost:
$800
$360 5,569 $90 26 $360
5,569
kWh
$90
26
MMBtu
TOTAL RECOMMENDED Savings:
$8,730
Cost:
$6,190
$7,170 111,372 $1,560 431 $7,170
111,372
kWh
$1,560
431
MMBtu
TOTAL IMPLEMENTED Savings:
$2,970
Cost:
$2,010
$2,070 31,360 $900 248 $2,070
31,360
kWh
$900
248
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas