IAC Assessment: CO0296
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0296
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1994
Principal Product Electronics assembly equipment
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 84
Plant Area (Sq.Ft.) 69,000
Annual Production 300 Pieces
Production Hrs. Annual 2,860
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,420 919,402 kWh $0.08
Natural Gas $7,750 1,928 MMBtu $4.02
TOTAL ENERGY COSTS $78,170
RECOMMENDED SAVINGS* $12,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,650
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$2,750
Cost:
$1,200
$2,280 29,601 $470 117 - - $2,280
29,601
kWh
$470
117
MMBtu
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,750
Cost:
$1,620
$2,280 34,291 $470 117 - - $2,280
34,291
kWh
$470
117
MMBtu
-
-
$
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$1,380
Cost:
$600
- - $1,380 344 - - -
-
kWh
$1,380
344
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,000
Cost:
$1,980
$1,000 13,189 - - - - $1,000
13,189
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$970
Cost:
$1,200
$970 15,240 - - - - $970
15,240
kWh
-
-
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,100
Cost:
$2,100
- - - - $2,100 - -
-
kWh
-
-
MMBtu
$2,100
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$670
Cost:
$800
- - $670 167 - - -
-
kWh
$670
167
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$610
Cost:
$1,000
$610 7,913 - - - - $610
7,913
kWh
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$600
Cost:
$220
$600 7,913 - - - - $600
7,913
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,830
Cost:
$10,720
$7,740 108,147 $2,990 745 $2,100 - $7,740
108,147
kWh
$2,990
745
MMBtu
$2,100
-
$
TOTAL IMPLEMENTED Savings:
$3,650
Cost:
$3,600
$1,600 21,102 $2,050 511 - - $1,600
21,102
kWh
$2,050
511
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes