Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1994 |
Principal Product | fabricated metal parts |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 1,666,000 Pounds |
Production Hrs. Annual | 4,290 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $79,790 | 1,619,871 | kWh | $0.05 |
Natural Gas | $38,410 | 10,081 | MMBtu | $3.81 |
TOTAL ENERGY COSTS | $118,200 | |||
RECOMMENDED SAVINGS* | $64,030 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,860 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Gaseous Waste | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Gaseous Waste | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS |
Savings: $53,800 Cost: $7,000 |
- | - | - | - | - | - | $2,000 | 15,500 | $51,800 | 1,840 |
- - kWh |
- - MMBtu |
- - gal |
$2,000 15,500 lb |
$51,800 1,840 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,400 Cost: $570 |
$3,400 | 68,875 | - | - | - | - | - | - | - | - |
$3,400 68,875 kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,320 Cost: $3,890 |
$2,320 | 47,186 | - | - | - | - | - | - | - | - |
$2,320 47,186 kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER |
Savings: $2,020 Cost: $3,500 |
- | - | - | - | $830 | 2,840 | - | - | $1,190 | 990 |
- - kWh |
- - MMBtu |
$830 2,840 gal |
- - lb |
$1,190 990 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,030 Cost: $5,700 |
- | - | $2,030 | 637 | - | - | - | - | - | - |
- - kWh |
$2,030 637 MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $460 Cost: $400 |
$460 | 9,379 | - | - | - | - | - | - | - | - |
$460 9,379 kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $64,030 Cost: $21,060 |
$6,180 | 125,440 | $2,030 | 637 | $830 | 2,840 | $2,000 | 15,500 | $52,990 | 2,830 | $6,180 125,440 kWh |
$2,030 637 MMBtu |
$830 2,840 gal |
$2,000 15,500 lb |
$52,990 2,830 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,860 Cost: $970 |
$3,860 | 78,254 | - | - | - | - | - | - | - | - | $3,860 78,254 kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Gaseous Waste | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Gaseous Waste |