IAC logo
IAC Assessment: CO0314
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0314
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1994
Principal Product asphalt and aggregate
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 4,560
Annual Production 1,300,000 Tons
Production Hrs. Annual 2,130
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,460 1,548,359 kWh $0.08
Natural Gas $457,010 109,072 MMBtu $4.19
TOTAL ENERGY COSTS $587,470
RECOMMENDED SAVINGS* $173,520 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,030
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$61,350
Cost:
$51,760
- - $61,350 15,223 -
-
kWh
$61,350
15,223
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$42,630
Cost:
$7,900
- - $42,630 9,526 -
-
kWh
$42,630
9,526
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$23,680
Cost:
$19,840
- - $23,680 5,697 -
-
kWh
$23,680
5,697
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$23,400
Cost:
$5,000
- - $23,400 5,496 -
-
kWh
$23,400
5,496
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$14,140
Cost:
$2,470
- - $14,140 3,168 -
-
kWh
$14,140
3,168
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,240
Cost:
$8,240
$4,240 42,790 - - $4,240
42,790
kWh
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,080
Cost:
$13,110
$4,080 38,687 - - $4,080
38,687
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$173,520
Cost:
$108,320
$8,320 81,477 $165,200 39,110 $8,320
81,477
kWh
$165,200
39,110
MMBtu
TOTAL IMPLEMENTED Savings:
$98,030
Cost:
$54,090
$8,320 81,477 $89,710 20,719 $8,320
81,477
kWh
$89,710
20,719
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas