Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1994 |
Principal Product | semiconductors |
NAICS | n/a |
SIC | 3674 - Semiconductors And Related Devices |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 69,000 |
Annual Production | 4,800,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $135,910 | 4,929,953 | kWh | $0.03 |
Natural Gas | $32,240 | 8,529 | MMBtu | $3.78 |
TOTAL ENERGY COSTS | $168,150 | |||
RECOMMENDED SAVINGS* | $12,360 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,030 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (haz) | Electricity Usage | Natural Gas | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $7,950 Cost: $30 |
$7,950 | 192,556 | - | - | - | - |
$7,950 192,556 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $1,290 Cost: - |
- | - | - | - | $1,290 | 580 |
- - kWh |
- - MMBtu |
$1,290 580 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,070 Cost: $1,770 |
$1,070 | 25,791 | - | - | - | - |
$1,070 25,791 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,010 Cost: $5,310 |
$1,010 | 24,619 | - | - | - | - |
$1,010 24,619 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $630 Cost: $650 |
- | - | $630 | 168 | - | - |
- - kWh |
$630 168 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $410 Cost: $2,000 |
$410 | 9,965 | - | - | - | - |
$410 9,965 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,360 Cost: $9,760 |
$10,440 | 252,931 | $630 | 168 | $1,290 | 580 | $10,440 252,931 kWh |
$630 168 MMBtu |
$1,290 580 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,030 Cost: $7,110 |
$10,030 | 242,966 | - | - | - | - | $10,030 242,966 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (haz) | Electricity Usage | Natural Gas | Solid Waste (haz) |