Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1994 |
Principal Product | metal water control gates |
NAICS | n/a |
SIC | 3441 - Fabricated Structural Metal |
Sales | $10,000,000-$50,000,000 |
# of Employees | 68 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 4,300,600 Pounds |
Production Hrs. Annual | 2,210 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $95,710 | 1,450,469 | kWh | $0.07 |
Natural Gas | $33,900 | 8,648 | MMBtu | $3.92 |
TOTAL ENERGY COSTS | $129,610 | |||
RECOMMENDED SAVINGS* | $43,400 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,070 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (haz) | Gaseous Waste | Electricity Usage | Natural Gas | Solid Waste (haz) | Gaseous Waste | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.7214 REDUCE OR ELIMINATE WASTE |
Savings: $27,620 Cost: $15,000 |
- | - | - | - | $27,620 | 11,200 | - | - |
- - kWh |
- - MMBtu |
$27,620 11,200 lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $6,830 Cost: $7,860 |
$(-870) | (-13,189) | $7,700 | 1,964 | - | - | - | - |
$(-870) (-13,189) kWh |
$7,700 1,964 MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $820 Cost: $820 |
- | - | $820 | 632 | - | - | - | - |
- - kWh |
$820 632 MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER |
Savings: $2,210 Cost: $1,750 |
- | - | - | - | - | - | $2,210 | 4,530 |
- - kWh |
- - MMBtu |
- - lb |
$2,210 4,530 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,590 Cost: $2,260 |
$1,590 | 24,033 | - | - | - | - | - | - |
$1,590 24,033 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,580 Cost: $3,000 |
$1,580 | 24,033 | - | - | - | - | - | - |
$1,580 24,033 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS |
Savings: $1,310 Cost: $1,300 |
- | - | - | - | - | - | $1,310 | 230 |
- - kWh |
- - MMBtu |
- - lb |
$1,310 230 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $880 Cost: $370 |
$880 | 13,482 | - | - | - | - | - | - |
$880 13,482 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $560 Cost: $960 |
$560 | 8,499 | - | - | - | - | - | - |
$560 8,499 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,400 Cost: $33,320 |
$3,740 | 56,858 | $8,520 | 2,596 | $27,620 | 11,200 | $3,520 | 4,760 | $3,740 56,858 kWh |
$8,520 2,596 MMBtu |
$27,620 11,200 lb |
$3,520 4,760 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,070 Cost: $13,200 |
$2,160 | 32,825 | $7,700 | 1,964 | - | - | $2,210 | 4,530 | $2,160 32,825 kWh |
$7,700 1,964 MMBtu |
- - lb |
$2,210 4,530 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (haz) | Gaseous Waste | Electricity Usage | Natural Gas | Solid Waste (haz) | Gaseous Waste |