Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1995 |
Principal Product | Metal Lockers |
NAICS | n/a |
SIC | 2542 - Partitions And Fixtures, Except Wood |
Sales | $5,000,000-$10,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 14,000 Pieces |
Production Hrs. Annual | 4,278 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $125,898 | 1,786,049 | kWh | $0.07 |
Natural Gas | $81,963 | 18,434 | MMBtu | $4.45 |
TOTAL ENERGY COSTS | $231,491 | |||
RECOMMENDED SAVINGS* | $256,060 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $236,840 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | Electricity Usage | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $222,920 Cost: $92,000 |
- | - | - | - | $17,200 | 21,000 | $205,720 | - |
- - kWh |
- - MMBtu |
$17,200 21,000 gal |
$205,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $10,210 Cost: $18,340 |
- | - | $10,210 | 2,168 | - | - | - | - |
- - kWh |
$10,210 2,168 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,600 Cost: $130 |
$6,600 | 85,287 | - | - | - | - | - | - |
$6,600 85,287 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,560 Cost: $21,980 |
$6,560 | 91,735 | - | - | - | - | - | - |
$6,560 91,735 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $7,980 Cost: $23,400 |
- | - | $7,980 | 936 | - | - | - | - |
- - kWh |
$7,980 936 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $660 Cost: $170 |
$660 | 9,672 | - | - | - | - | - | - |
$660 9,672 kWh |
- - MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $480 Cost: $300 |
$180 | 4,103 | $300 | 67 | - | - | - | - |
$180 4,103 kWh |
$300 67 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $370 Cost: $530 |
- | - | - | - | - | 100 | $370 | - |
- - kWh |
- - MMBtu |
- 100 gal |
$370 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT |
Savings: $280 Cost: $450 |
- | - | $280 | 59 | - | - | - | - |
- - kWh |
$280 59 MMBtu |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $256,060 Cost: $157,300 |
$14,000 | 190,797 | $18,770 | 3,230 | $17,200 | 21,100 | $206,090 | - | $14,000 190,797 kWh |
$18,770 3,230 MMBtu |
$17,200 21,100 gal |
$206,090 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $236,840 Cost: $114,860 |
$13,340 | 181,125 | $580 | 126 | $17,200 | 21,000 | $205,720 | - | $13,340 181,125 kWh |
$580 126 MMBtu |
$17,200 21,000 gal |
$205,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Ancillary Material Cost | Electricity Usage | Natural Gas | Other Liquid (haz) | Ancillary Material Cost |