IAC logo
IAC Assessment: CO0354
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0354
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product bottom-dump trailers
NAICS n/a
SIC 3715 - Truck Trailers
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 26,000
Annual Production 450 Pieces
Production Hrs. Annual 4,147
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,396 895,662 kWh $0.05
Electricity Demand $19,473 3,073 kW-months/year $6.34
Natural Gas $33,357 6,096 MMBtu $5.47
TOTAL ENERGY COSTS $107,336
RECOMMENDED SAVINGS* $19,610 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,570
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$6,620
Cost:
$12,550
- - - - - - - - $130 (-6,250) $6,490 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$130
(-6,250)
lb
$6,490
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$10,060
Cost:
$47,840
$7,300 150,645 $2,760 435 - - - - - - - - $7,300
150,645
kWh
$2,760
435
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,640
Cost:
$1,310
- - - - $1,640 302 - - - - - - -
-
kWh
-
-
kW-months/year
$1,640
302
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$590
Cost:
$1,065
$400 8,206 $190 30 - - - - - - - - $400
8,206
kWh
$190
30
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$510
Cost:
$140
$360 7,620 $150 23 - - - - - - - - $360
7,620
kWh
$150
23
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$190
Cost:
-
- - - - - - $550 80 - - $(-360) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$550
80
gal
-
-
lb
$(-360)
-
$
TOTAL RECOMMENDED Savings:
$19,610
Cost:
$62,905
$8,060 166,471 $3,100 488 $1,640 302 $550 80 $130 (-6,250) $6,130 - $8,060
166,471
kWh
$3,100
488
kW-months/year
$1,640
302
MMBtu
$550
80
gal
$130
(-6,250)
lb
$6,130
-
$
TOTAL IMPLEMENTED Savings:
$10,570
Cost:
$47,980
$7,660 158,265 $2,910 458 - - - - - - - - $7,660
158,265
kWh
$2,910
458
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (haz) Ancillary Material Cost