IAC logo
IAC Assessment: CO0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product ski lift systems
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 32,000
Annual Production 15 Pieces
Production Hrs. Annual 3,003
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,710 570,926 kWh $0.03
Electricity Demand $26,729 2,660 kW-months/year $10.05
Electricity Fees $(-228) - $ -
Natural Gas $5,413 1,525 MMBtu $3.55
TOTAL ENERGY COSTS $53,334
RECOMMENDED SAVINGS* $7,835 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $380
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$4,000
Cost:
$1,950
- - - - - - - - - - $4,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$4,000
-
$
02: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER Savings:
$2,260
Cost:
$1,000
- - - - - - $150 60 $760 - $1,350 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$150
60
gal
$760
-
$
$1,350
-
$
03: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$1,070
Cost:
$1,400
- - - - - - $1,380 80 - - $(-310) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,380
80
gal
-
-
$
$(-310)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$125
Cost:
$188
$55 1,465 $70 7 - - - - - - - - $55
1,465
kWh
$70
7
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$380
Cost:
$650
- - - - $380 107 - - - - - - -
-
kWh
-
-
kW-months/year
$380
107
MMBtu
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$7,835
Cost:
$5,188
$55 1,465 $70 7 $380 107 $1,530 140 $760 - $5,040 - $55
1,465
kWh
$70
7
kW-months/year
$380
107
MMBtu
$1,530
140
gal
$760
-
$
$5,040
-
$
TOTAL IMPLEMENTED Savings:
$380
Cost:
$650
- - - - $380 107 - - - - - - -
-
kWh
-
-
kW-months/year
$380
107
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost