IAC Assessment: CO0392
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0392
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product personal respiratory equipment
NAICS n/a
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 73,000
Annual Production 2,200 Pieces
Production Hrs. Annual 2,470
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,262 984,174 kWh $0.02
Electricity Demand $42,893 2,894 kW-months/year $14.82
Electricity Fees $156 - $ -
Natural Gas $6,962 1,828 MMBtu $3.81
TOTAL ENERGY COSTS $72,273
RECOMMENDED SAVINGS* $35,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,620
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ %
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,440
Cost:
$600
$260 14,068 $1,180 81 - - - - - - - - $260
14,068
kWh
$1,180
81
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$960
Cost:
-
- - $960 66 - - - - - - - - -
-
kWh
$960
66
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$960
Cost:
-
- - - - $960 - - - - - - - -
-
kWh
-
-
kW-months/year
$960
-
lb
-
-
$
-
-
$
-
-
%
04: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES Savings:
$2,780
Cost:
$10,000
- - - - - - - - $2,780 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$2,780
-
$
-
-
%
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$29,660
Cost:
$30,000
- - - - - - $3,260 - - - $26,400 - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,260
-
$
-
-
$
$26,400
-
%
TOTAL RECOMMENDED Savings:
$35,800
Cost:
$40,600
$260 14,068 $2,140 147 $960 - $3,260 - $2,780 - $26,400 - $260
14,068
kWh
$2,140
147
kW-months/year
$960
-
lb
$3,260
-
$
$2,780
-
$
$26,400
-
%
TOTAL IMPLEMENTED Savings:
$30,620
Cost:
$30,000
- - $960 66 - - $3,260 - - - $26,400 - -
-
kWh
$960
66
kW-months/year
-
-
lb
$3,260
-
$
-
-
$
$26,400
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production