Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1997 |
Principal Product | personal respiratory equipment |
NAICS | n/a |
SIC | 3842 - Surgical Appliances And Supplies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 73,000 |
Annual Production | 2,200 Pieces |
Production Hrs. Annual | 2,470 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $19,262 | 984,174 | kWh | $0.02 |
Electricity Demand | $42,893 | 2,894 | kW-months/year | $14.82 |
Electricity Fees | $156 | - | $ | - |
Natural Gas | $6,962 | 1,828 | MMBtu | $3.81 |
TOTAL ENERGY COSTS | $72,273 | |||
RECOMMENDED SAVINGS* | $35,800 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,620 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,440 Cost: $600 |
$260 | 14,068 | $1,180 | 81 | - | - | - | - | - | - | - | - |
$260 14,068 kWh |
$1,180 81 kW-months/year |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $960 Cost: - |
- | - | $960 | 66 | - | - | - | - | - | - | - | - |
- - kWh |
$960 66 kW-months/year |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $960 Cost: - |
- | - | - | - | $960 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$960 - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES |
Savings: $2,780 Cost: $10,000 |
- | - | - | - | - | - | - | - | $2,780 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$2,780 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $29,660 Cost: $30,000 |
- | - | - | - | - | - | $3,260 | - | - | - | $26,400 | - |
- - kWh |
- - kW-months/year |
- - lb |
$3,260 - $ |
- - $ |
$26,400 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,800 Cost: $40,600 |
$260 | 14,068 | $2,140 | 147 | $960 | - | $3,260 | - | $2,780 | - | $26,400 | - | $260 14,068 kWh |
$2,140 147 kW-months/year |
$960 - lb |
$3,260 - $ |
$2,780 - $ |
$26,400 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,620 Cost: $30,000 |
- | - | $960 | 66 | - | - | $3,260 | - | - | - | $26,400 | - | - - kWh |
$960 66 kW-months/year |
- - lb |
$3,260 - $ |
- - $ |
$26,400 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production |