IAC Assessment: CO0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1997
Principal Product fabricated metal products
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 31,800
Annual Production 570,000 Thousand Feet
Production Hrs. Annual 2,574
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,790 731,829 kWh $0.02
Electricity Demand $51,369 3,625 kW-months/year $14.17
Electricity Fees $497 - $ -
Natural Gas $45,528 12,411 MMBtu $3.67
TOTAL ENERGY COSTS $117,224
RECOMMENDED SAVINGS* $9,985 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$5,110
Cost:
$5,390
$1,040 56,272 - - $4,070 1,083 - - - - $1,040
56,272
kWh
-
-
kW-months/year
$4,070
1,083
MMBtu
-
-
lb
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$835
Cost:
$90
$381 18,464 $454 35 - - - - - - $381
18,464
kWh
$454
35
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$840
Cost:
-
$840 43,376 - - - - - - - - $840
43,376
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$800
Cost:
$330
$180 9,379 $620 44 - - - - - - $180
9,379
kWh
$620
44
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,820
Cost:
-
- - - - - - $1,820 25,900 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,820
25,900
lb
-
-
lb
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$410
Cost:
-
- - - - - - - - $410 90 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$410
90
lb
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$170
Cost:
-
- - - - - - $170 6,450 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$170
6,450
lb
-
-
lb
TOTAL RECOMMENDED Savings:
$9,985
Cost:
$5,810
$2,441 127,491 $1,074 79 $4,070 1,083 $1,990 32,350 $410 90 $2,441
127,491
kWh
$1,074
79
kW-months/year
$4,070
1,083
MMBtu
$1,990
32,350
lb
$410
90
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz)