IAC logo
IAC Assessment: CO0417
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0417
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product printed circuit boards & assembled electronic components
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 42,600
Annual Production 63,650 Thousand Feet
Production Hrs. Annual 4,420
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $133,255 1,474,502 kWh $0.09
Electricity Demand $15,107 3,572 kW-months/year $4.23
Electricity Fees $2,821 - $ -
Natural Gas $9,967 2,352 MMBtu $4.24
TOTAL ENERGY COSTS $168,014
RECOMMENDED SAVINGS* $333,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $270,435
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $ $ %
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,680
Cost:
$1,230
- - - - $1,680 393 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,680
393
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$155
Cost:
$227
$134 2,052 $21 5 - - - - - - - - - - - - - - $134
2,052
kWh
$21
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$860
Cost:
$50
$730 10,844 $130 30 - - - - - - - - - - - - - - $730
10,844
kWh
$130
30
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$390
Cost:
-
$390 4,689 - - - - - - - - - - - - - - - - $390
4,689
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$350
Cost:
$420
$300 4,396 $50 12 - - - - - - - - - - - - - - $300
4,396
kWh
$50
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,560
Cost:
-
- - - - - - $1,560 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,560
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$630
Cost:
-
- - - - - - - - $630 171 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$630
171
lb
-
-
$
-
-
$
-
-
$
-
-
%
08: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$148,000
Cost:
$560
- - - - - - - - - - - - - - - - $148,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
$148,000
-
%
09: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$119,000
Cost:
$55,330
- - - - - - - - - - $200,000 - $(-81,000) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$200,000
-
$
$(-81,000)
-
$
-
-
$
-
-
%
10: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$61,000
Cost:
-
- - - - - - - - - - $5,000 - - - $56,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$5,000
-
$
-
-
$
$56,000
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$333,625
Cost:
$57,817
$1,554 21,981 $201 47 $1,680 393 $1,560 - $630 171 $205,000 - $(-81,000) - $56,000 - $148,000 - $1,554
21,981
kWh
$201
47
kW-months/year
$1,680
393
MMBtu
$1,560
-
lb
$630
171
lb
$205,000
-
$
$(-81,000)
-
$
$56,000
-
$
$148,000
-
%
TOTAL IMPLEMENTED Savings:
$270,435
Cost:
$57,817
$1,554 21,981 $201 47 $1,680 393 - - - - $200,000 - $(-81,000) - - - $148,000 - $1,554
21,981
kWh
$201
47
kW-months/year
$1,680
393
MMBtu
-
-
lb
-
-
lb
$200,000
-
$
$(-81,000)
-
$
-
-
$
$148,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Administrative Changes Primary Product Increase in Production