IAC logo
IAC Assessment: CO0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0418
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product automation & high-speed retrieval equipment
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 40,000
Annual Production 84 Pieces
Production Hrs. Annual 2,860
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $18,139 648,300 kWh $0.03
Electricity Demand $13,385 1,544 kW-months/year $8.67
Electricity Fees $144 - $ -
Natural Gas $5,012 1,267 MMBtu $3.96
TOTAL ENERGY COSTS $43,343
RECOMMENDED SAVINGS* $29,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,020
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ %
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,020
Cost:
$2,000
- - $2,020 193 - - - - - - - - - - - - -
-
kWh
$2,020
193
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,800
Cost:
$700
$400 24,619 $1,830 270 $(-430) (-105) - - - - - - - - - - $400
24,619
kWh
$1,830
270
kW-months/year
$(-430)
(-105)
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$640
Cost:
$330
$180 10,844 $460 68 - - - - - - - - - - - - $180
10,844
kWh
$460
68
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
%
04: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$7,100
Cost:
-
- - - - - - $2,530 440 - - $1,090 - $280 - $3,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,530
440
gal
-
-
lb
$1,090
-
$
$280
-
$
$3,200
-
%
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$7,130
Cost:
$500
- - - - - - - - $550 820 - - $6,580 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$550
820
lb
-
-
$
$6,580
-
$
-
-
%
06: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$210
Cost:
-
- - - - - - - - - - - - $210 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$210
-
$
-
-
%
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$10,560
Cost:
$4,510
$(-70) (-4,103) $(-240) (-36) - - - - - - $8,840 - $2,030 - - - $(-70)
(-4,103)
kWh
$(-240)
(-36)
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$8,840
-
$
$2,030
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$29,460
Cost:
$8,040
$510 31,360 $4,070 495 $(-430) (-105) $2,530 440 $550 820 $9,930 - $9,100 - $3,200 - $510
31,360
kWh
$4,070
495
kW-months/year
$(-430)
(-105)
MMBtu
$2,530
440
gal
$550
820
lb
$9,930
-
$
$9,100
-
$
$3,200
-
%
TOTAL IMPLEMENTED Savings:
$15,020
Cost:
$7,540
$510 31,360 $4,070 495 $(-430) (-105) - - - - $8,840 - $2,030 - - - $510
31,360
kWh
$4,070
495
kW-months/year
$(-430)
(-105)
MMBtu
-
-
gal
-
-
lb
$8,840
-
$
$2,030
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Increase in Production