Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1998 |
Principal Product | automation & high-speed retrieval equipment |
NAICS | n/a |
SIC | 3559 - Special Industry Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 84 Pieces |
Production Hrs. Annual | 2,860 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $18,139 | 648,300 | kWh | $0.03 |
Electricity Demand | $13,385 | 1,544 | kW-months/year | $8.67 |
Electricity Fees | $144 | - | $ | - |
Natural Gas | $5,012 | 1,267 | MMBtu | $3.96 |
TOTAL ENERGY COSTS | $43,343 | |||
RECOMMENDED SAVINGS* | $29,460 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,020 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $2,020 Cost: $2,000 |
- | - | $2,020 | 193 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$2,020 193 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,800 Cost: $700 |
$400 | 24,619 | $1,830 | 270 | $(-430) | (-105) | - | - | - | - | - | - | - | - | - | - |
$400 24,619 kWh |
$1,830 270 kW-months/year |
$(-430) (-105) MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $640 Cost: $330 |
$180 | 10,844 | $460 | 68 | - | - | - | - | - | - | - | - | - | - | - | - |
$180 10,844 kWh |
$460 68 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $7,100 Cost: - |
- | - | - | - | - | - | $2,530 | 440 | - | - | $1,090 | - | $280 | - | $3,200 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,530 440 gal |
- - lb |
$1,090 - $ |
$280 - $ |
$3,200 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $7,130 Cost: $500 |
- | - | - | - | - | - | - | - | $550 | 820 | - | - | $6,580 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$550 820 lb |
- - $ |
$6,580 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $210 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $210 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$210 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $10,560 Cost: $4,510 |
$(-70) | (-4,103) | $(-240) | (-36) | - | - | - | - | - | - | $8,840 | - | $2,030 | - | - | - |
$(-70) (-4,103) kWh |
$(-240) (-36) kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$8,840 - $ |
$2,030 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,460 Cost: $8,040 |
$510 | 31,360 | $4,070 | 495 | $(-430) | (-105) | $2,530 | 440 | $550 | 820 | $9,930 | - | $9,100 | - | $3,200 | - | $510 31,360 kWh |
$4,070 495 kW-months/year |
$(-430) (-105) MMBtu |
$2,530 440 gal |
$550 820 lb |
$9,930 - $ |
$9,100 - $ |
$3,200 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,020 Cost: $7,540 |
$510 | 31,360 | $4,070 | 495 | $(-430) | (-105) | - | - | - | - | $8,840 | - | $2,030 | - | - | - | $510 31,360 kWh |
$4,070 495 kW-months/year |
$(-430) (-105) MMBtu |
- - gal |
- - lb |
$8,840 - $ |
$2,030 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Increase in Production |