Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1998 |
Principal Product | automotive & marine batteries |
NAICS | n/a |
SIC | 3691 - Storage Batteries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 235 |
Plant Area (Sq.Ft.) | 113,900 |
Annual Production | 550,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $179,515 | 10,166,765 | kWh | $0.02 |
Electricity Demand | $238,017 | 16,464 | kW-months/year | $14.46 |
Electricity Fees | $1,689 | - | $ | - |
Natural Gas | $118,444 | 29,775 | MMBtu | $3.98 |
TOTAL ENERGY COSTS | $626,633 | |||
RECOMMENDED SAVINGS* | $32,464 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $6,930 Cost: $6,000 |
- | - | $6,930 | 480 | - | - | - | - | - | - |
- - kWh |
$6,930 480 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,400 Cost: $1,120 |
- | - | - | - | $3,400 | 788 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,400 788 MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS |
Savings: $2,170 Cost: $2,820 |
$960 | 53,048 | $1,210 | 84 | - | - | - | - | - | - |
$960 53,048 kWh |
$1,210 84 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $350 Cost: $350 |
$120 | 7,034 | $230 | 16 | - | - | - | - | - | - |
$120 7,034 kWh |
$230 16 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS |
Savings: $19,614 Cost: $27,000 |
- | - | - | - | - | - | $478 | (-23,920) | $19,136 | 23,920 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$478 (-23,920) lb |
$19,136 23,920 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $32,464 Cost: $37,290 |
$1,080 | 60,082 | $8,370 | 580 | $3,400 | 788 | $478 | (-23,920) | $19,136 | 23,920 | $1,080 60,082 kWh |
$8,370 580 kW-months/year |
$3,400 788 MMBtu |
$478 (-23,920) lb |
$19,136 23,920 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) |