IAC logo
IAC Assessment: CO0419
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0419
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product automotive & marine batteries
NAICS n/a
SIC 3691 - Storage Batteries
Sales $10,000,000-$50,000,000
# of Employees 235
Plant Area (Sq.Ft.) 113,900
Annual Production 550,000 Pieces
Production Hrs. Annual 4,160
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,515 10,166,765 kWh $0.02
Electricity Demand $238,017 16,464 kW-months/year $14.46
Electricity Fees $1,689 - $ -
Natural Gas $118,444 29,775 MMBtu $3.98
TOTAL ENERGY COSTS $626,633
RECOMMENDED SAVINGS* $32,464 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,930
Cost:
$6,000
- - $6,930 480 - - - - - - -
-
kWh
$6,930
480
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,400
Cost:
$1,120
- - - - $3,400 788 - - - - -
-
kWh
-
-
kW-months/year
$3,400
788
MMBtu
-
-
lb
-
-
lb
03: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS Savings:
$2,170
Cost:
$2,820
$960 53,048 $1,210 84 - - - - - - $960
53,048
kWh
$1,210
84
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$350
Cost:
$350
$120 7,034 $230 16 - - - - - - $120
7,034
kWh
$230
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
05: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$19,614
Cost:
$27,000
- - - - - - $478 (-23,920) $19,136 23,920 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$478
(-23,920)
lb
$19,136
23,920
lb
TOTAL RECOMMENDED Savings:
$32,464
Cost:
$37,290
$1,080 60,082 $8,370 580 $3,400 788 $478 (-23,920) $19,136 23,920 $1,080
60,082
kWh
$8,370
580
kW-months/year
$3,400
788
MMBtu
$478
(-23,920)
lb
$19,136
23,920
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz)