IAC Assessment: CO0427
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0427
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product bricks
NAICS n/a
SIC 3251 - Brick And Structural Clay Tile
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 55,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,493 1,438,453 kWh $0.02
Electricity Demand $74,207 10,225 kW-months/year $7.26
Electricity Fees $1,666 - $ -
Natural Gas $235,263 90,908 MMBtu $2.59
TOTAL ENERGY COSTS $337,469
RECOMMENDED SAVINGS* $60,270 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,280
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$500
Cost:
$2,082
$197 11,137 $303 21 - - - - - - $197
11,137
kWh
$303
21
kW-months/year
-
-
lb
-
-
$
-
-
%
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$290
Cost:
$1,000
$90 5,275 $200 24 - - - - - - $90
5,275
kWh
$200
24
kW-months/year
-
-
lb
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$240
Cost:
$40
$70 4,103 $170 20 - - - - - - $70
4,103
kWh
$170
20
kW-months/year
-
-
lb
-
-
$
-
-
%
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$210
Cost:
-
- - - - $210 - - - - - -
-
kWh
-
-
kW-months/year
$210
-
lb
-
-
$
-
-
%
05: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$34,700
Cost:
$300,000
- - - - - - - - $34,700 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$34,700
-
%
06: 4.6210 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$6,080
Cost:
$30,000
- - - - - - - - $6,080 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$6,080
-
%
07: 4.6530 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS Savings:
$18,250
Cost:
$27,000
- - - - - - $18,250 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$18,250
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$60,270
Cost:
$360,122
$357 20,515 $673 65 $210 - $18,250 - $40,780 - $357
20,515
kWh
$673
65
kW-months/year
$210
-
lb
$18,250
-
$
$40,780
-
%
TOTAL IMPLEMENTED Savings:
$19,280
Cost:
$30,122
$357 20,515 $673 65 - - $18,250 - - - $357
20,515
kWh
$673
65
kW-months/year
-
-
lb
$18,250
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Increase in Production