IAC Assessment: CO0429
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0429
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product finished metal components
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 11,250
Annual Production 8,850 Pieces
Production Hrs. Annual 4,290
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,336 889,801 kWh $0.02
Electricity Demand $41,319 2,931 kW-months/year $14.10
Electricity Fees $590 - $ -
Natural Gas $10,953 2,346 MMBtu $4.67
TOTAL ENERGY COSTS $95,192
RECOMMENDED SAVINGS* $15,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,700
#|Description Savings
Cost
Status Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product
$ kW-months/year $ gal $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$840
Cost:
$1,000
$840 60 - - - - - - - - $840
60
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
$
02: 3.2161 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE Savings:
$4,860
Cost:
-
- - $2,050 300 $60 - $2,750 - - - -
-
kW-months/year
$2,050
300
gal
$60
-
$
$2,750
-
$
-
-
$
03: 3.1242 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT Savings:
$2,930
Cost:
$800
- - - - $320 - $2,610 - - - -
-
kW-months/year
-
-
gal
$320
-
$
$2,610
-
$
-
-
$
04: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$6,000
Cost:
$10,160
- - - - - - - - $6,000 - -
-
kW-months/year
-
-
gal
-
-
$
-
-
$
$6,000
-
$
05: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$730
Cost:
$280
- - - - - - - - $730 - -
-
kW-months/year
-
-
gal
-
-
$
-
-
$
$730
-
$
TOTAL RECOMMENDED Savings:
$15,360
Cost:
$12,240
$840 60 $2,050 300 $380 - $5,360 - $6,730 - $840
60
kW-months/year
$2,050
300
gal
$380
-
$
$5,360
-
$
$6,730
-
$
TOTAL IMPLEMENTED Savings:
$11,700
Cost:
$11,160
$840 60 $2,050 300 $60 - $2,750 - $6,000 - $840
60
kW-months/year
$2,050
300
gal
$60
-
$
$2,750
-
$
$6,000
-
$
Savings
Cost
$ kW-months/year $ gal $ $ $ $ $ $
Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Demand Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product