IAC logo
IAC Assessment: CO0432
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0432
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product wooden pallets
NAICS n/a
SIC 2448 - Wood Pallets And Skids
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 40,000
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 2,340
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,392 791,325 kWh $0.02
Electricity Demand $35,889 2,664 kW-months/year $13.47
Electricity Fees $1,579 - $ -
Natural Gas $13,872 3,368 MMBtu $4.12
TOTAL ENERGY COSTS $77,046
RECOMMENDED SAVINGS* $18,180 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,030
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,030
Cost:
$150
$300 11,723 $730 55 - - - - - - $300
11,723
kWh
$730
55
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,610
Cost:
$1,400
- - $1,610 120 - - - - - - -
-
kWh
$1,610
120
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$380
Cost:
$50
$80 4,982 $300 23 - - - - - - $80
4,982
kWh
$300
23
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 3.8135 USE LOW VOC OR WATER BASED PAINT Savings:
$10,460
Cost:
$5,000
- - - - $(-2,420) - - - $12,880 - -
-
kWh
-
-
kW-months/year
$(-2,420)
-
gal
-
-
lb
$12,880
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,230
Cost:
$2,500
- - - - - - $3,230 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$3,230
-
lb
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,470
Cost:
$3,000
- - - - - - $1,470 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,470
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$18,180
Cost:
$12,100
$380 16,705 $2,640 198 $(-2,420) - $4,700 - $12,880 - $380
16,705
kWh
$2,640
198
kW-months/year
$(-2,420)
-
gal
$4,700
-
lb
$12,880
-
$
TOTAL IMPLEMENTED Savings:
$1,030
Cost:
$150
$300 11,723 $730 55 - - - - - - $300
11,723
kWh
$730
55
kW-months/year
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost