Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1999 |
Principal Product | injection molded plastic parts |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 53 |
Plant Area (Sq.Ft.) | 17,400 |
Annual Production | 3,500,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $15,000 | 897,421 | kWh | $0.02 |
Electricity Demand | $29,785 | 3,858 | kW-months/year | $7.72 |
Electricity Fees | $660 | - | $ | - |
Natural Gas | $3,987 | 876 | MMBtu | $4.55 |
TOTAL ENERGY COSTS | $52,575 | |||
RECOMMENDED SAVINGS* | $22,270 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,270 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,870 Cost: $14,850 |
$1,950 | 118,992 | $2,920 | 366 | - | - | - | - | - | - | - | - |
$1,950 118,992 kWh |
$2,920 366 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,380 Cost: $2,000 |
- | - | $1,380 | 156 | - | - | - | - | - | - | - | - |
- - kWh |
$1,380 156 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $570 Cost: $710 |
$80 | 4,982 | $580 | 72 | $(-90) | (-21) | - | - | - | - | - | - |
$80 4,982 kWh |
$580 72 kW-months/year |
$(-90) (-21) MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $370 Cost: $500 |
$160 | 9,672 | $210 | 27 | - | - | - | - | - | - | - | - |
$160 9,672 kWh |
$210 27 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $310 Cost: $100 |
- | - | - | - | $310 | 73 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$310 73 MMBtu |
- - lb |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $210 Cost: $134 |
- | - | - | - | - | - | $280 | 96 | $(-70) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$280 96 lb |
$(-70) - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $10,920 Cost: - |
- | - | - | - | - | - | - | - | - | - | $10,920 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$10,920 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $3,640 Cost: $8,000 |
- | - | - | - | - | - | - | - | - | - | $3,640 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$3,640 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,270 Cost: $26,294 |
$2,190 | 133,646 | $5,090 | 621 | $220 | 52 | $280 | 96 | $(-70) | - | $14,560 | - | $2,190 133,646 kWh |
$5,090 621 kW-months/year |
$220 52 MMBtu |
$280 96 lb |
$(-70) - $ |
$14,560 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,270 Cost: $2,734 |
$160 | 9,672 | $1,590 | 183 | $310 | 73 | $280 | 96 | $(-70) | - | - | - | $160 9,672 kWh |
$1,590 183 kW-months/year |
$310 73 MMBtu |
$280 96 lb |
$(-70) - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Ancillary Material Cost | Increase in Production |