IAC Assessment: CO0442
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product plexiglass skylights & parts
NAICS n/a
SIC 3038 -
Sales $10,000,000-$50,000,000
# of Employees 52
Plant Area (Sq.Ft.) 77,000
Annual Production 2,440 Pieces
Production Hrs. Annual 4,160
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,815 973,623 kWh $0.02
Electricity Demand $52,197 3,742 kW-months/year $13.95
Electricity Fees $204 - $ -
Natural Gas $6,426 1,447 MMBtu $4.44
TOTAL ENERGY COSTS $84,102
RECOMMENDED SAVINGS* $384,582 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,980
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,620
Cost:
$330
$820 45,135 $1,800 130 - - - - - - - - - - - - - - $820
45,135
kWh
$1,800
130
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,490
Cost:
$4,000
- - $2,490 180 - - - - - - - - - - - - - - -
-
kWh
$2,490
180
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$360
Cost:
$50
$110 6,155 $250 18 - - - - - - - - - - - - - - $110
6,155
kWh
$250
18
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$240
Cost:
$450
- - - - $240 55 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$240
55
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,720
Cost:
-
- - - - - - $1,720 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,720
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,352
Cost:
-
- - - - - - - - $1,520 480 - - $(-168) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,520
480
lb
-
-
$
$(-168)
-
$
-
-
$
-
-
%
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$318,400
Cost:
$105,000
- - - - - - - - - - $(-41,600) - - - - - $360,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$(-41,600)
-
$
-
-
$
-
-
$
$360,000
-
%
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$57,400
Cost:
$10,000
- - - - - - - - - - - - - - $57,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
$57,400
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$384,582
Cost:
$119,830
$930 51,290 $4,540 328 $240 55 $1,720 - $1,520 480 $(-41,600) - $(-168) - $57,400 - $360,000 - $930
51,290
kWh
$4,540
328
kW-months/year
$240
55
MMBtu
$1,720
-
lb
$1,520
480
lb
$(-41,600)
-
$
$(-168)
-
$
$57,400
-
$
$360,000
-
%
TOTAL IMPLEMENTED Savings:
$2,980
Cost:
$380
$930 51,290 $2,050 148 - - - - - - - - - - - - - - $930
51,290
kWh
$2,050
148
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production