IAC Assessment: CO0444
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0444
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product compressed air system components
NAICS n/a
SIC 3596 - Scales And Balances, Exc. Laboratory
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 195,059
Annual Production 500,000 Pieces
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,693 5,930,832 kWh $0.02
Electricity Demand $187,684 13,427 kW-months/year $13.98
Electricity Fees $204 - $ -
Natural Gas $63,630 19,692 MMBtu $3.23
TOTAL ENERGY COSTS $426,063
RECOMMENDED SAVINGS* $26,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,280
Cost:
$1,000
$1,410 77,374 $2,910 210 - - - - $(-1,040) - - - - - $1,410
77,374
kWh
$2,910
210
kW-months/year
-
-
Tgal
-
-
lb
$(-1,040)
-
$
-
-
$
-
-
Tgal
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,560
Cost:
$450
$660 36,342 $2,900 209 - - - - - - - - - - $660
36,342
kWh
$2,900
209
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$600
Cost:
-
$620 34,291 $1,350 97 - - - - - - $(-1,370) - - - $620
34,291
kWh
$1,350
97
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$(-1,370)
-
$
-
-
Tgal
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$19,000
Cost:
$21,600
$(-790) (-43,376) $(-1,150) (-83) $9,900 11,037,600 - - - - - - $11,040 - $(-790)
(-43,376)
kWh
$(-1,150)
(-83)
kW-months/year
$9,900
11,037,600
Tgal
-
-
lb
-
-
$
-
-
$
$11,040
-
Tgal
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$230
Cost:
-
- - - - - - $250 86 - - $(-20) - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$250
86
lb
-
-
$
$(-20)
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$26,670
Cost:
$23,050
$1,900 104,631 $6,010 433 $9,900 11,037,600 $250 86 $(-1,040) - $(-1,390) - $11,040 - $1,900
104,631
kWh
$6,010
433
kW-months/year
$9,900
11,037,600
Tgal
$250
86
lb
$(-1,040)
-
$
$(-1,390)
-
$
$11,040
-
Tgal
TOTAL IMPLEMENTED Savings:
$4,110
Cost:
$1,000
$2,030 111,665 $4,260 307 - - $250 86 $(-1,040) - $(-1,390) - - - $2,030
111,665
kWh
$4,260
307
kW-months/year
-
-
Tgal
$250
86
lb
$(-1,040)
-
$
$(-1,390)
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Water Disposal Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Water Disposal Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption