IAC logo
IAC Assessment: CO0447
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0447
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product kitchen & bath cabinets
NAICS n/a
SIC 2434 - Wood Kitchen Cabinets
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 38,440
Annual Production 32,000 Pieces
Production Hrs. Annual 4,420
Location (State) WY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,553 632,474 kWh $0.02
Electricity Demand $16,572 1,840 kW-months/year $9.01
Electricity Fees $300 - $ -
Natural Gas $6,757 1,776 MMBtu $3.80
TOTAL ENERGY COSTS $43,971
RECOMMENDED SAVINGS* $115,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $83,490
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,160
Cost:
$5,000
- - $2,160 240 - - - - - - - - -
-
kWh
$2,160
240
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,270
Cost:
$660
$1,000 42,790 $1,050 116 - - $(-780) - - - - - $1,000
42,790
kWh
$1,050
116
kW-months/year
-
-
lb
$(-780)
-
$
-
-
$
-
-
$
03: 3.8125 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER Savings:
$2,250
Cost:
$1,100
- - - - - - $1,900 - $350 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,900
-
$
$350
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$170
Cost:
-
- - - - $190 64 - - $(-20) - - - -
-
kWh
-
-
kW-months/year
$190
64
lb
-
-
$
$(-20)
-
$
-
-
$
05: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$80,060
Cost:
$200,000
- - - - - - $80,060 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$80,060
-
$
-
-
$
-
-
$
06: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$29,130
Cost:
$30,000
- - - - - - $(-40,000) - - - $69,130 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-40,000)
-
$
-
-
$
$69,130
-
$
TOTAL RECOMMENDED Savings:
$115,040
Cost:
$236,760
$1,000 42,790 $3,210 356 $190 64 $41,180 - $330 - $69,130 - $1,000
42,790
kWh
$3,210
356
kW-months/year
$190
64
lb
$41,180
-
$
$330
-
$
$69,130
-
$
TOTAL IMPLEMENTED Savings:
$83,490
Cost:
$205,660
$1,000 42,790 $3,210 356 - - $79,280 - - - - - $1,000
42,790
kWh
$3,210
356
kW-months/year
-
-
lb
$79,280
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product