Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product molds for plastic injection molding
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 86,304
Annual Production 1,750,000 Pounds
Production Hrs. Annual 2,600
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,263 2,167,351 kWh $0.01
Electricity Demand $72,499 6,833 kW-months/year $10.61
Natural Gas $19,975 4,573 MMBtu $4.37
TOTAL ENERGY COSTS $124,737
RECOMMENDED SAVINGS* $18,660 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,800
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,280
Cost:
$60,960
$2,630 176,729 $8,650 915 - - $2,630
176,729
kWh
$8,650
915
kW-months/year
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,800
Cost:
$15,000
- - $5,800 546 - - -
-
kWh
$5,800
546
kW-months/year
-
-
$
03: 4.214 PURCHASE APPROPRIATELY SIZED MATERIAL Savings:
$1,580
Cost:
-
- - - - $1,580 - -
-
kWh
-
-
kW-months/year
$1,580
-
$
TOTAL RECOMMENDED Savings:
$18,660
Cost:
$75,960
$2,630 176,729 $14,450 1,461 $1,580 - $2,630
176,729
kWh
$14,450
1,461
kW-months/year
$1,580
-
$
TOTAL IMPLEMENTED Savings:
$5,800
Cost:
$15,000
- - $5,800 546 - - -
-
kWh
$5,800
546
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost