Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product energy management controls
NAICS n/a
SIC 3822 - Environmental Controls
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 110,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 7,478
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,398 4,240,914 kWh $0.04
Electricity Demand $35,690 8,888 kW-months/year $4.02
Electricity Fees $74,148 - $ -
Natural Gas $7,357 1,979 MMBtu $3.72
TOTAL ENERGY COSTS $303,593
RECOMMENDED SAVINGS* $14,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,250
Cost:
$1,380
$5,250 156,800 - - - - - - $5,250
156,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,130
Cost:
$10,000
- - $5,130 445 - - - - -
-
kWh
$5,130
445
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,380
Cost:
$2,150
- - - - $2,380 667 - - -
-
kWh
-
-
kW-months/year
$2,380
667
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$800
Cost:
$240
$1,010 25,498 $570 49 - - $(-780) - $1,010
25,498
kWh
$570
49
kW-months/year
-
-
MMBtu
$(-780)
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$670
Cost:
$320
$460 11,430 $210 18 - - - - $460
11,430
kWh
$210
18
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$320
Cost:
$890
$210 4,103 $110 10 - - - - $210
4,103
kWh
$110
10
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,550
Cost:
$14,980
$6,930 197,831 $6,020 522 $2,380 667 $(-780) - $6,930
197,831
kWh
$6,020
522
kW-months/year
$2,380
667
MMBtu
$(-780)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes