IAC logo
IAC Assessment: CO0462
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0462
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product custom architectural woodwork
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 110,077
Annual Production 10,000 Pieces
Production Hrs. Annual 3,146
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,718 2,459,555 kWh $0.03
Electricity Demand $75,353 18,142 kW-months/year $4.15
Electricity Fees $4,380 - $ -
Natural Gas $23,363 5,494 MMBtu $4.25
TOTAL ENERGY COSTS $214,598
RECOMMENDED SAVINGS* $22,870 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ lb $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,560
Cost:
$16,820
- - $6,560 894 - - - - - - - - - - - - -
-
kWh
$6,560
894
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,610
Cost:
$4,900
$1,530 38,687 $1,080 148 - - - - - - - - - - - - $1,530
38,687
kWh
$1,080
148
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,410
Cost:
-
$490 12,309 $380 52 - - - - - - - - $(-320) - $860 - $490
12,309
kWh
$380
52
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
$(-320)
-
$
$860
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,340
Cost:
$1,390
- - - - $1,340 300 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,340
300
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$830
Cost:
$470
$730 18,464 $490 67 - - - - - - - - $(-390) - - - $730
18,464
kWh
$490
67
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
$(-390)
-
$
-
-
$
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$9,460
Cost:
$2,000
- - - - - - $760 350 $450 990 - - - - $8,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$760
350
gal
$450
990
lb
-
-
lb
-
-
$
$8,250
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$660
Cost:
-
- - - - - - - - - - $670 235 - - $(-10) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$670
235
lb
-
-
$
$(-10)
-
$
TOTAL RECOMMENDED Savings:
$22,870
Cost:
$25,580
$2,750 69,460 $8,510 1,161 $1,340 300 $760 350 $450 990 $670 235 $(-710) - $9,100 - $2,750
69,460
kWh
$8,510
1,161
kW-months/year
$1,340
300
MMBtu
$760
350
gal
$450
990
lb
$670
235
lb
$(-710)
-
$
$9,100
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost