Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2000 |
Principal Product | metal stamping, metal finishing, heat treating |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 43,000 |
Annual Production | 1,000,000 Pounds |
Production Hrs. Annual | 4,264 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $74,398 | 2,541,325 | kWh | $0.03 |
Electricity Demand | $58,103 | 13,728 | kW-months/year | $4.23 |
Electricity Fees | $4,647 | - | $ | - |
Natural Gas | $20,447 | 4,584 | MMBtu | $4.46 |
TOTAL ENERGY COSTS | $167,737 | |||
RECOMMENDED SAVINGS* | $34,830 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,430 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $7,540 Cost: $16,000 |
$4,890 | 104,045 | $4,630 | 600 | $(-1,980) | (-444) | - | - | - | - | - | - | - | - | - | - |
$4,890 104,045 kWh |
$4,630 600 kW-months/year |
$(-1,980) (-444) MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $5,190 Cost: $7,500 |
- | - | $5,190 | 672 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$5,190 672 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,240 Cost: $1,210 |
$3,240 | 94,959 | $1,000 | 130 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,240 94,959 kWh |
$1,000 130 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,350 Cost: $400 |
$1,630 | 47,773 | $500 | 65 | - | - | - | - | - | - | $(-780) | - | - | - | - | - |
$1,630 47,773 kWh |
$500 65 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$(-780) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $750 Cost: $350 |
$480 | 12,309 | $270 | 35 | - | - | - | - | - | - | - | - | - | - | - | - |
$480 12,309 kWh |
$270 35 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $4,090 Cost: $7,960 |
- | - | - | - | - | - | $1,310 | 1,285,500 | - | - | - | - | - | - | $2,780 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,310 1,285,500 Tgal |
- - lb |
- - $ |
- - $ |
$2,780 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $280 Cost: - |
- | - | - | - | - | - | - | - | $280 | 97 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$280 97 lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.623 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME |
Savings: $6,930 Cost: $6,000 |
- | - | - | - | - | - | - | - | - | - | $6,930 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$6,930 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $4,460 Cost: $250 |
- | - | - | - | - | - | - | - | - | - | - | - | $4,460 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$4,460 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,830 Cost: $39,670 |
$10,240 | 259,086 | $11,590 | 1,502 | $(-1,980) | (-444) | $1,310 | 1,285,500 | $280 | 97 | $6,150 | - | $4,460 | - | $2,780 | - | $10,240 259,086 kWh |
$11,590 1,502 kW-months/year |
$(-1,980) (-444) MMBtu |
$1,310 1,285,500 Tgal |
$280 97 lb |
$6,150 - $ |
$4,460 - $ |
$2,780 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,430 Cost: $9,920 |
$5,350 | 155,041 | $1,770 | 230 | - | - | $1,310 | 1,285,500 | - | - | $(-780) | - | - | - | $2,780 | - | $5,350 155,041 kWh |
$1,770 230 kW-months/year |
- - MMBtu |
$1,310 1,285,500 Tgal |
- - lb |
$(-780) - $ |
- - $ |
$2,780 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |