IAC Assessment: CO0466
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0466
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product analytical instruments
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 75,000
Annual Production 330 Pieces
Production Hrs. Annual 2,340
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,866 2,282,825 kWh $0.02
Electricity Demand $73,351 4,972 kW-months/year $14.75
Electricity Fees $1,727 - $ -
Natural Gas $2,418 478 MMBtu $5.06
TOTAL ENERGY COSTS $125,048
RECOMMENDED SAVINGS* $60,180 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,300
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,420
Cost:
$10,000
- - $4,420 300 - - - - - - - - - - - - -
-
kWh
$4,420
300
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,120
Cost:
-
$440 24,619 $1,680 114 - - - - - - - - - - - - $440
24,619
kWh
$1,680
114
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$540
Cost:
$870
$130 7,034 $530 36 $(-120) (-24) - - - - - - - - - - $130
7,034
kWh
$530
36
kW-months/year
$(-120)
(-24)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$470
Cost:
$1,000
$90 4,982 $380 26 - - - - - - - - - - - - $90
4,982
kWh
$380
26
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$220
Cost:
$280
$40 2,638 $180 12 - - - - - - - - - - - - $40
2,638
kWh
$180
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$640
Cost:
-
- - - - - - - - $670 235 - - $(-30) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$670
235
lb
-
-
$
$(-30)
-
$
-
-
Tgal
07: 3.4151 MINIMIZE WATER USAGE Savings:
$1,030
Cost:
$320
- - - - - - $550 278,500 - - $(-440) - - - $920 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$550
278,500
Tgal
-
-
lb
$(-440)
-
$
-
-
$
$920
-
Tgal
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$50,740
Cost:
$40,000
- - - - - - - - - - $29,740 - $21,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$29,740
-
$
$21,000
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$60,180
Cost:
$52,470
$700 39,273 $7,190 488 $(-120) (-24) $550 278,500 $670 235 $29,300 - $20,970 - $920 - $700
39,273
kWh
$7,190
488
kW-months/year
$(-120)
(-24)
MMBtu
$550
278,500
Tgal
$670
235
lb
$29,300
-
$
$20,970
-
$
$920
-
Tgal
TOTAL IMPLEMENTED Savings:
$57,300
Cost:
$51,320
$90 4,982 $4,800 326 - - $550 278,500 $670 235 $29,300 - $20,970 - $920 - $90
4,982
kWh
$4,800
326
kW-months/year
-
-
MMBtu
$550
278,500
Tgal
$670
235
lb
$29,300
-
$
$20,970
-
$
$920
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Personnel Changes Ancillary Material Cost Water Consumption