Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2000 |
Principal Product | prepared meat products |
NAICS | n/a |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $1,000,000-$5,000,000 |
# of Employees | 18 |
Plant Area (Sq.Ft.) | 22,000 |
Annual Production | 1,075,800 Pounds |
Production Hrs. Annual | 2,210 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,972 | 857,562 | kWh | $0.06 |
Electricity Demand | $9,537 | 3,705 | kW-months/year | $2.57 |
Electricity Fees | $144 | - | $ | - |
Natural Gas | $11,224 | 2,214 | MMBtu | $5.07 |
TOTAL ENERGY COSTS | $76,160 | |||
RECOMMENDED SAVINGS* | $57,010 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,850 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $3,000 Cost: $9,500 |
$2,840 | 47,773 | $160 | 62 | - | - | - | - | - | - | - | - | - | - |
$2,840 47,773 kWh |
$160 62 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $860 Cost: $2,270 |
- | - | - | - | $860 | 174 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$860 174 MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $590 Cost: $1,510 |
$590 | 9,965 | - | - | - | - | - | - | - | - | - | - | - | - |
$590 9,965 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $350 Cost: - |
$350 | 5,862 | $50 | 21 | - | - | - | - | $(-30) | - | $(-20) | - | - | - |
$350 5,862 kWh |
$50 21 kW-months/year |
- - MMBtu |
- - lb |
$(-30) - $ |
$(-20) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $730 Cost: $50 |
- | - | - | - | - | - | $730 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$730 - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $27,300 Cost: $20,000 |
- | - | - | - | - | - | - | - | $22,100 | - | - | - | $5,200 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$22,100 - $ |
- - $ |
$5,200 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $22,100 Cost: $9,000 |
- | - | - | - | - | - | - | - | $22,100 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$22,100 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $2,080 Cost: $1,200 |
- | - | - | - | - | - | - | - | $2,080 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$2,080 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,010 Cost: $43,530 |
$3,780 | 63,600 | $210 | 83 | $860 | 174 | $730 | - | $46,250 | - | $(-20) | - | $5,200 | - | $3,780 63,600 kWh |
$210 83 kW-months/year |
$860 174 MMBtu |
$730 - lb |
$46,250 - $ |
$(-20) - $ |
$5,200 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,850 Cost: $21,260 |
$3,780 | 63,600 | $210 | 83 | - | - | $730 | - | $24,150 | - | $(-20) | - | - | - | $3,780 63,600 kWh |
$210 83 kW-months/year |
- - MMBtu |
$730 - lb |
$24,150 - $ |
$(-20) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production |