IAC Assessment: CO0469
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product prepared meat products
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $1,000,000-$5,000,000
# of Employees 18
Plant Area (Sq.Ft.) 22,000
Annual Production 1,075,800 Pounds
Production Hrs. Annual 2,210
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,972 857,562 kWh $0.06
Electricity Demand $9,537 3,705 kW-months/year $2.57
Electricity Fees $144 - $ -
Natural Gas $11,224 2,214 MMBtu $5.07
TOTAL ENERGY COSTS $76,160
RECOMMENDED SAVINGS* $57,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,850
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$3,000
Cost:
$9,500
$2,840 47,773 $160 62 - - - - - - - - - - $2,840
47,773
kWh
$160
62
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$860
Cost:
$2,270
- - - - $860 174 - - - - - - - - -
-
kWh
-
-
kW-months/year
$860
174
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$590
Cost:
$1,510
$590 9,965 - - - - - - - - - - - - $590
9,965
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$350
Cost:
-
$350 5,862 $50 21 - - - - $(-30) - $(-20) - - - $350
5,862
kWh
$50
21
kW-months/year
-
-
MMBtu
-
-
lb
$(-30)
-
$
$(-20)
-
$
-
-
%
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$730
Cost:
$50
- - - - - - $730 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$730
-
lb
-
-
$
-
-
$
-
-
%
06: 4.446 AUTOMATE FINISHING PROCESS Savings:
$27,300
Cost:
$20,000
- - - - - - - - $22,100 - - - $5,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$22,100
-
$
-
-
$
$5,200
-
%
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$22,100
Cost:
$9,000
- - - - - - - - $22,100 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$22,100
-
$
-
-
$
-
-
%
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$2,080
Cost:
$1,200
- - - - - - - - $2,080 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,080
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$57,010
Cost:
$43,530
$3,780 63,600 $210 83 $860 174 $730 - $46,250 - $(-20) - $5,200 - $3,780
63,600
kWh
$210
83
kW-months/year
$860
174
MMBtu
$730
-
lb
$46,250
-
$
$(-20)
-
$
$5,200
-
%
TOTAL IMPLEMENTED Savings:
$28,850
Cost:
$21,260
$3,780 63,600 $210 83 - - $730 - $24,150 - $(-20) - - - $3,780
63,600
kWh
$210
83
kW-months/year
-
-
MMBtu
$730
-
lb
$24,150
-
$
$(-20)
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production