IAC logo
IAC Assessment: CO0475
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0475
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2000
Principal Product metal and plastic carts and hand trucks
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 54,000
Annual Production 156,000 Pieces
Production Hrs. Annual 2,470
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,058 652,110 kWh $0.04
Electricity Demand $20,610 4,315 kW-months/year $4.78
Electricity Fees $(-1,010) - $ -
Natural Gas $44,285 10,268 MMBtu $4.31
TOTAL ENERGY COSTS $94,337
RECOMMENDED SAVINGS* $65,080 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,180
Cost:
$4,580
$(-110) (-2,052) - - $3,290 748 - - - - - - - - $(-110)
(-2,052)
kWh
-
-
kW-months/year
$3,290
748
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,330
Cost:
$5,470
- - $3,330 450 - - - - - - - - - - -
-
kWh
$3,330
450
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,100
Cost:
$6,000
- - $1,100 144 - - - - - - - - - - -
-
kWh
$1,100
144
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$300
Cost:
$490
$580 13,482 $500 65 - - - - $(-780) - - - - - $580
13,482
kWh
$500
65
kW-months/year
-
-
MMBtu
-
-
lb
$(-780)
-
$
-
-
$
-
-
%
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,430
Cost:
-
- - - - - - $1,430 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,430
-
lb
-
-
$
-
-
$
-
-
%
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$34,630
Cost:
$100,000
$1,350 31,360 $1,580 206 $15,320 3,480 - - $16,380 - - - - - $1,350
31,360
kWh
$1,580
206
kW-months/year
$15,320
3,480
MMBtu
-
-
lb
$16,380
-
$
-
-
$
-
-
%
07: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$14,590
Cost:
$45,000
- - - - - - - - - - $14,590 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$14,590
-
$
-
-
%
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$6,520
Cost:
$20,000
- - - - - - - - - - - - $6,520 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$6,520
-
%
TOTAL RECOMMENDED Savings:
$65,080
Cost:
$181,540
$1,820 42,790 $6,510 865 $18,610 4,228 $1,430 - $15,600 - $14,590 - $6,520 - $1,820
42,790
kWh
$6,510
865
kW-months/year
$18,610
4,228
MMBtu
$1,430
-
lb
$15,600
-
$
$14,590
-
$
$6,520
-
%
TOTAL IMPLEMENTED Savings:
$36,360
Cost:
$100,490
$1,930 44,842 $2,080 271 $15,320 3,480 $1,430 - $15,600 - - - - - $1,930
44,842
kWh
$2,080
271
kW-months/year
$15,320
3,480
MMBtu
$1,430
-
lb
$15,600
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Increase in Production