Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2000 |
Principal Product | metal and plastic carts and hand trucks |
NAICS | n/a |
SIC | 3537 - Industrial Trucks And Tractors |
Sales | $5,000,000-$10,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 54,000 |
Annual Production | 156,000 Pieces |
Production Hrs. Annual | 2,470 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $23,058 | 652,110 | kWh | $0.04 |
Electricity Demand | $20,610 | 4,315 | kW-months/year | $4.78 |
Electricity Fees | $(-1,010) | - | $ | - |
Natural Gas | $44,285 | 10,268 | MMBtu | $4.31 |
TOTAL ENERGY COSTS | $94,337 | |||
RECOMMENDED SAVINGS* | $65,080 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,360 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $3,180 Cost: $4,580 |
$(-110) | (-2,052) | - | - | $3,290 | 748 | - | - | - | - | - | - | - | - |
$(-110) (-2,052) kWh |
- - kW-months/year |
$3,290 748 MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,330 Cost: $5,470 |
- | - | $3,330 | 450 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$3,330 450 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $1,100 Cost: $6,000 |
- | - | $1,100 | 144 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$1,100 144 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $300 Cost: $490 |
$580 | 13,482 | $500 | 65 | - | - | - | - | $(-780) | - | - | - | - | - |
$580 13,482 kWh |
$500 65 kW-months/year |
- - MMBtu |
- - lb |
$(-780) - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,430 Cost: - |
- | - | - | - | - | - | $1,430 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,430 - lb |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $34,630 Cost: $100,000 |
$1,350 | 31,360 | $1,580 | 206 | $15,320 | 3,480 | - | - | $16,380 | - | - | - | - | - |
$1,350 31,360 kWh |
$1,580 206 kW-months/year |
$15,320 3,480 MMBtu |
- - lb |
$16,380 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.444 INSTALL SYSTEM TO COLLECT SCRAP |
Savings: $14,590 Cost: $45,000 |
- | - | - | - | - | - | - | - | - | - | $14,590 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$14,590 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $6,520 Cost: $20,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $6,520 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$6,520 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,080 Cost: $181,540 |
$1,820 | 42,790 | $6,510 | 865 | $18,610 | 4,228 | $1,430 | - | $15,600 | - | $14,590 | - | $6,520 | - | $1,820 42,790 kWh |
$6,510 865 kW-months/year |
$18,610 4,228 MMBtu |
$1,430 - lb |
$15,600 - $ |
$14,590 - $ |
$6,520 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,360 Cost: $100,490 |
$1,930 | 44,842 | $2,080 | 271 | $15,320 | 3,480 | $1,430 | - | $15,600 | - | - | - | - | - | $1,930 44,842 kWh |
$2,080 271 kW-months/year |
$15,320 3,480 MMBtu |
$1,430 - lb |
$15,600 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Increase in Production |