IAC logo
IAC Assessment: CO0481
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0481
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2001
Principal Product contract manufacturer of medical, communications and misc. e
NAICS n/a
SIC 3826 - Analytical Instruments
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 64,350
Annual Production 120,000 Pieces
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,293 699,100 kWh $0.03
Electricity Demand $17,982 1,917 kW-months/year $9.38
Electricity Fees $120 - $ -
Natural Gas $7,077 1,537 MMBtu $4.60
TOTAL ENERGY COSTS $60,568
RECOMMENDED SAVINGS* $7,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,690
Cost:
$2,000
- - $1,690 180 - - - - - - -
-
kWh
$1,690
180
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,370
Cost:
-
$1,370 45,000 - - - - - - - - $1,370
45,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,230
Cost:
$880
- - - - $1,230 231 - - - - -
-
kWh
-
-
kW-months/year
$1,230
231
MMBtu
-
-
lb
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,030
Cost:
-
$1,030 33,800 - - - - - - - - $1,030
33,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$870
Cost:
$130
$670 22,100 $560 60 - - - - $(-360) - $670
22,100
kWh
$560
60
kW-months/year
-
-
MMBtu
-
-
lb
$(-360)
-
$
06: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$820
Cost:
$2,330
- - - - $820 154 - - - - -
-
kWh
-
-
kW-months/year
$820
154
MMBtu
-
-
lb
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$480
Cost:
$30
$260 8,400 $220 23 - - - - - - $260
8,400
kWh
$220
23
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$300
Cost:
$130
- - - - $300 56 - - - - -
-
kWh
-
-
kW-months/year
$300
56
MMBtu
-
-
lb
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$160
Cost:
-
- - - - - - $160 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$160
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$7,950
Cost:
$5,500
$3,330 109,300 $2,470 263 $2,350 441 $160 - $(-360) - $3,330
109,300
kWh
$2,470
263
kW-months/year
$2,350
441
MMBtu
$160
-
lb
$(-360)
-
$
TOTAL IMPLEMENTED Savings:
$5,780
Cost:
$3,470
$3,070 100,900 $560 60 $2,350 441 $160 - $(-360) - $3,070
100,900
kWh
$560
60
kW-months/year
$2,350
441
MMBtu
$160
-
lb
$(-360)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes