Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2001 |
Principal Product | Coal |
NAICS | n/a |
SIC | 1221 - Bituminous Coal And Lignitesurface |
Sales | $10,000,000-$50,000,000 |
# of Employees | 155 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 2,100,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,399,690 | 22,330,000 | kWh | $0.06 |
Electricity Fees | $836 | - | $ | - |
Natural Gas | $98,015 | 9,793 | MMBtu | $10.01 |
TOTAL ENERGY COSTS | $1,498,541 | |||
RECOMMENDED SAVINGS* | $26,700 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,040 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $8,100 Cost: $1,470 |
$8,100 | 129,200 | - | - | - | - | - | - |
$8,100 129,200 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $6,010 Cost: $8,660 |
$(-200) | (-3,200) | $6,210 | 633 | - | - | - | - |
$(-200) (-3,200) kWh |
$6,210 633 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.9111 USE SOLAR HEAT TO HEAT MAKE-UP AIR |
Savings: $4,980 Cost: $29,800 |
$(-330) | (-5,300) | $5,310 | 541 | - | - | - | - |
$(-330) (-5,300) kWh |
$5,310 541 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $3,040 Cost: $6,460 |
- | - | $3,040 | 310 | - | - | - | - |
- - kWh |
$3,040 310 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,280 Cost: $2,060 |
- | - | $2,280 | 232 | - | - | - | - |
- - kWh |
$2,280 232 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,160 Cost: $3,610 |
$1,210 | 19,320 | $950 | 97 | - | - | - | - |
$1,210 19,320 kWh |
$950 97 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $130 Cost: - |
$1,620 | 25,900 | - | - | $(-510) | - | $(-980) | - |
$1,620 25,900 kWh |
- - MMBtu |
$(-510) - $ |
$(-980) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,700 Cost: $52,060 |
$10,400 | 165,920 | $17,790 | 1,813 | $(-510) | - | $(-980) | - | $10,400 165,920 kWh |
$17,790 1,813 MMBtu |
$(-510) - $ |
$(-980) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,040 Cost: $6,460 |
- | - | $3,040 | 310 | - | - | - | - | - - kWh |
$3,040 310 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost |