IAC logo
IAC Assessment: CO0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product gold
NAICS 212221 - Gold Ore Mining
SIC 1041 - Gold Ores
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 81,650
Annual Production 24,005 Pounds
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $8,689,261 145,937,543 kWh $0.06
Electricity Demand $855,399 374,024 kW-months/year $2.29
Electricity Fees $530,111 - $ -
LPG $1,462,812 271,468 MMBtu $5.39
TOTAL ENERGY COSTS $11,537,583
RECOMMENDED SAVINGS* $783,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$616,200
Cost:
$4,800,000
$558,500 8,760,000 - - - - $(-100,000) - $157,700 - $558,500
8,760,000
kWh
-
-
kW-months/year
-
-
MMBtu
$(-100,000)
-
$
$157,700
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$90,030
Cost:
$21,080
$83,910 1,316,000 $6,900 1,803 - - $(-780) - - - $83,910
1,316,000
kWh
$6,900
1,803
kW-months/year
-
-
MMBtu
$(-780)
-
$
-
-
$
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$44,200
Cost:
$30,000
- - - - $44,200 8,202 - - - - -
-
kWh
-
-
kW-months/year
$44,200
8,202
MMBtu
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$19,300
Cost:
$38,900
$17,830 279,700 $1,470 383 - - - - - - $17,830
279,700
kWh
$1,470
383
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$9,370
Cost:
$2,480
$8,660 135,800 $710 186 - - - - - - $8,660
135,800
kWh
$710
186
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,380
Cost:
$900
- - - - $4,380 812 - - - - -
-
kWh
-
-
kW-months/year
$4,380
812
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$783,480
Cost:
$4,893,360
$668,900 10,491,500 $9,080 2,372 $48,580 9,014 $(-100,780) - $157,700 - $668,900
10,491,500
kWh
$9,080
2,372
kW-months/year
$48,580
9,014
MMBtu
$(-100,780)
-
$
$157,700
-
$
TOTAL IMPLEMENTED Savings:
$103,780
Cost:
$24,460
$92,570 1,451,800 $7,610 1,989 $4,380 812 $(-780) - - - $92,570
1,451,800
kWh
$7,610
1,989
kW-months/year
$4,380
812
MMBtu
$(-780)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes