IAC logo
IAC Assessment: CO0521
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0521
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2003
Principal Product Biopharmaceuticals
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 2836 - Biological Products Exc. Diagnostic
Sales >$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 628,100
Annual Production 15,435 Pounds
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,498,721 36,786,782 kWh $0.04
Natural Gas $825,538 142,045 MMBtu $5.81
TOTAL ENERGY COSTS $2,434,152
RECOMMENDED SAVINGS* $121,980 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,010
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ gal $ $ $ $
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$65,190
Cost:
$82,000
$65,190 1,694,000 - - - - - - - - $65,190
1,694,000
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,840
Cost:
$5,100
$2,840 73,900 - - - - - - - - $2,840
73,900
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$2,010
Cost:
$1,400
- - $2,010 491 - - - - - - -
-
kWh
$2,010
491
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,000
Cost:
$200
$2,360 61,400 - - - - $(-360) - - - $2,360
61,400
kWh
-
-
MMBtu
-
-
gal
$(-360)
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,650
Cost:
$3,532
$2,150 55,888 - - - - - - $(-500) - $2,150
55,888
kWh
-
-
MMBtu
-
-
gal
-
-
$
$(-500)
-
$
06: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$48,290
Cost:
$175,000
$8,260 214,700 $3,790 925 $36,240 36,240 - - - - $8,260
214,700
kWh
$3,790
925
MMBtu
$36,240
36,240
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$121,980
Cost:
$267,232
$80,800 2,099,888 $5,800 1,416 $36,240 36,240 $(-360) - $(-500) - $80,800
2,099,888
kWh
$5,800
1,416
MMBtu
$36,240
36,240
gal
$(-360)
-
$
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$4,010
Cost:
$1,600
$2,360 61,400 $2,010 491 - - $(-360) - - - $2,360
61,400
kWh
$2,010
491
MMBtu
-
-
gal
$(-360)
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $ $ $
Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost