IAC Assessment: CO0526
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0526
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2003
Principal Product Lithographic printing plates
NAICS 333244 - Printing Machinery and Equipment Manufacturing
SIC 3555 - Printing Trades Machinery
Sales $100,000,000-$500,000,000
# of Employees 220
Plant Area (Sq.Ft.) 370,100
Annual Production 180,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $918,338 24,104,000 kWh $0.04
Natural Gas $93,699 24,528 MMBtu $3.82
Other Energy $780,326 177,448 MMBtu $4.40
TOTAL ENERGY COSTS $1,792,363
RECOMMENDED SAVINGS* $63,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,792
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Ancillary Material Cost Electricity Usage Personnel Changes Ancillary Material Cost
$ kWh $ $ $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$21,790
Cost:
$37,580
$21,790 571,900 - - - - $21,790
571,900
kWh
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,240
Cost:
$33,710
$13,240 347,400 - - - - $13,240
347,400
kWh
-
-
$
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$8,350
Cost:
$1,640
$6,480 170,200 $120 - $1,750 - $6,480
170,200
kWh
$120
-
$
$1,750
-
$
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$8,180
Cost:
$3,150
$6,870 180,300 $685 - $625 - $6,870
180,300
kWh
$685
-
$
$625
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,602
Cost:
$5,670
$3,993 104,665 - - $1,609 - $3,993
104,665
kWh
-
-
$
$1,609
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,060
Cost:
$580
$(-1,380) (-36,200) - - $4,440 - $(-1,380)
(-36,200)
kWh
-
-
$
$4,440
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,398
Cost:
$6,640
$2,884 75,686 - - $(-486) - $2,884
75,686
kWh
-
-
$
$(-486)
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$980
Cost:
$3,300
$980 25,600 - - - - $980
25,600
kWh
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$320
Cost:
$586
$701 18,396 - - $(-381) - $701
18,396
kWh
-
-
$
$(-381)
-
$
TOTAL RECOMMENDED Savings:
$63,920
Cost:
$92,856
$55,558 1,457,947 $805 - $7,557 - $55,558
1,457,947
kWh
$805
-
$
$7,557
-
$
TOTAL IMPLEMENTED Savings:
$49,792
Cost:
$83,410
$46,873 1,229,865 $685 - $2,234 - $46,873
1,229,865
kWh
$685
-
$
$2,234
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Ancillary Material Cost Electricity Usage Personnel Changes Ancillary Material Cost