IAC Assessment: CO0530
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0530
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2003
Principal Product Commercial printing (phone books)
NAICS 511140 - Directory and Mailing List Publishers
SIC 2741 - Miscellaneous Publishing
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 150,000
Annual Production 30,600,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $347,373 13,371,000 kWh $0.03
Electricity Demand $191,416 25,728 kW-months/year $7.44
Electricity Fees $420 - $ -
Natural Gas $20,574 5,163 MMBtu $3.98
TOTAL ENERGY COSTS $566,538
RECOMMENDED SAVINGS* $4,119,590 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,560
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$13,370
Cost:
$10,000
$9,520 365,500 $3,850 518 - - - - - - $9,520
365,500
kWh
$3,850
518
kW-months/year
-
-
$
-
-
$
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,370
Cost:
$230
$5,300 203,200 $2,070 278 - - - - - - $5,300
203,200
kWh
$2,070
278
kW-months/year
-
-
$
-
-
$
-
-
%
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,940
Cost:
$280
$2,940 112,700 - - - - - - - - $2,940
112,700
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,070
Cost:
$7,760
$1,320 50,700 $750 101 - - - - - - $1,320
50,700
kWh
$750
101
kW-months/year
-
-
$
-
-
$
-
-
%
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,830
Cost:
$4,140
$1,410 54,000 - - $110 - $310 - - - $1,410
54,000
kWh
-
-
kW-months/year
$110
-
$
$310
-
$
-
-
%
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,810
Cost:
$1,250
$1,230 47,200 $580 78 - - - - - - $1,230
47,200
kWh
$580
78
kW-months/year
-
-
$
-
-
$
-
-
%
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,200
Cost:
$570
$760 29,000 $300 40 $50 - $90 - - - $760
29,000
kWh
$300
40
kW-months/year
$50
-
$
$90
-
$
-
-
%
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$4,089,000
Cost:
$4,200,000
- - - - - - - - $4,089,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$4,089,000
-
%
TOTAL RECOMMENDED Savings:
$4,119,590
Cost:
$4,224,230
$22,480 862,300 $7,550 1,015 $160 - $400 - $4,089,000 - $22,480
862,300
kWh
$7,550
1,015
kW-months/year
$160
-
$
$400
-
$
$4,089,000
-
%
TOTAL IMPLEMENTED Savings:
$27,560
Cost:
$19,520
$20,310 779,300 $7,250 975 - - - - - - $20,310
779,300
kWh
$7,250
975
kW-months/year
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Increase in Production