IAC Assessment: CO0532
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0532
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2003
Principal Product Sub-bituminous coal
NAICS 212111 - Bituminous Coal and Lignite Surface Mining
SIC 1221 - Bituminous Coal And Lignitesurface
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 20,000,000 Tons
Production Hrs. Annual 8,760
Location (State) WY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $539,951 31,461,500 kWh $0.02
Electricity Demand $500,576 69,087 kW-months/year $7.25
Electricity Fees $5,700 - $ -
Natural Gas $79,358 22,014 MMBtu $3.60
TOTAL ENERGY COSTS $1,125,585
RECOMMENDED SAVINGS* $28,591 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,121
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4325 UPGRADE CONVEYORS Savings:
$19,310
Cost:
$46,220
$10,550 560,200 $5,830 842 $1,440 - $1,490 - $10,550
560,200
kWh
$5,830
842
kW-months/year
$1,440
-
$
$1,490
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,122
Cost:
$26,560
$2,799 148,656 $2,372 342 $342 - $(-391) - $2,799
148,656
kWh
$2,372
342
kW-months/year
$342
-
$
$(-391)
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,530
Cost:
$6,580
$1,380 73,400 $1,150 166 - - - - $1,380
73,400
kWh
$1,150
166
kW-months/year
-
-
$
-
-
$
04: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$1,160
Cost:
$4,000
$770 40,800 $390 56 - - - - $770
40,800
kWh
$390
56
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$330
Cost:
$110
$220 11,800 $110 16 - - - - $220
11,800
kWh
$110
16
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$139
Cost:
$139
$82 4,351 $69 10 - - $(-12) - $82
4,351
kWh
$69
10
kW-months/year
-
-
$
$(-12)
-
$
TOTAL RECOMMENDED Savings:
$28,591
Cost:
$83,609
$15,801 839,207 $9,921 1,432 $1,782 - $1,087 - $15,801
839,207
kWh
$9,921
1,432
kW-months/year
$1,782
-
$
$1,087
-
$
TOTAL IMPLEMENTED Savings:
$8,121
Cost:
$33,389
$4,481 238,207 $3,701 534 $342 - $(-403) - $4,481
238,207
kWh
$3,701
534
kW-months/year
$342
-
$
$(-403)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost